PORTLAND, OR —
OSHA Inspection: U.S. ARMY CORPS OF ENGINEERS, WAREHOUSE AND YARD
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of U.S. ARMY CORPS OF ENGINEERS, WAREHOUSE AND YARD in WAREHOUSE AND YARD 8010 NW SAINT HELENS ROAD, PORTLAND, OR 97210 (NAICS 493110). OSHA activity number 336829981.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- U.S. ARMY CORPS OF ENGINEERS, WAREHOUSE AND YARD
- Site address
- WAREHOUSE AND YARD 8010 NW SAINT HELENS ROAD
- City
- PORTLAND
- State
- OR
- ZIP
- 97210
- Mailing
- 8010 N.W. ST. HELENS ROAD, PORTLAND, OR 97210
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 493110
- Employees
- 10
- Ownership type
- D
Citations
6 citations on file for this inspection.
1910.304 G05
- Issued
- Nov 1, 2012
- Abate by
- Dec 3, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.304(g)(5): The paths to ground from circuits, equipment, and enclosures were not permanent, continuous, and effective. Warehouse A: On or about October 10, 2012 and times prior thereto, the GFCI plug did not show a ground when tested. This exposed employees to electric shock hazards from using equipment on a ungrounded system.
Recent events (1)
- — Z (S) $0
1910.334 A02 II
- Issued
- Nov 1, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.334(a)(2)(ii): There was a defect or evidence of damage that could have exposed an employee to injury and the defective or damaged item was not removed from service: Warehouse A: On or about October 10 2012 and times prior thereto, the electric floor finisher had a damaged cord. This exposed employees to electric shock hazards from using the equipment with a damaged cord.
Recent events (1)
- — Z (S) $0
1910.23 A08
- Issued
- Nov 1, 2012
- Abate by
- Dec 3, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.23(a)(8): Every floor hole into which persons can accidentally walk were not guarded: Dock: On or about October 10, 2012 and times prior thereto, the dock had areas with damaged boards. This exposed employees to trip hazards.
Recent events (1)
- — Z (O) $0
1910.137 B02 VIII
- Issued
- Nov 1, 2012
- Abate by
- Dec 3, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.137(b)(2)(viii): Electrical protective equipment was not subjected to periodic electrical tests in accordance with Tables I-5 and I-6: Electric shop: On or about October 10, 2012 and times prior thereto, the employer had not completed inspections on the electricall gloves. This exposed employees to shock hazards from using gloves that may not electrically safe.
Recent events (1)
- — Z (O) $0
1910.1200 G01
- Issued
- Nov 1, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(g)(1): The employer did not have a material safety data sheet for each hazardous chemical in use: Waregouse A: On or about October 10, 2012 and times prior thereto, the chemical Xtreme floor finish was being used and the employer did not have the MSDS for the product. This exposed employees to delays in receiving approriate first aid in the event of an accident.
Recent events (1)
- — Z (O) $0
1917.45 F01 I
- Issued
- Nov 1, 2012
- Abate by
- Jan 17, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1917.45(f)(1)(i): Crane or derrick operating controls were not clearly marked and no chart was posted at the operators position indicating their function. Yard area: On or about October 10, 2012 and times prior thereto, the Lorain 15 ton crane's controls were not clearly marked. This exposed employees to struck-by hazards from the possibility of improper use of the controls.
Recent events (1)
- — Z (O) $0
More inspections at U.S. Army Corps of Engineers, Warehouse and Yard
View U.S. Army Corps of Engineers, Warehouse and Yard's full OSHA safety record →
More inspections in this industry (NAICS 493110)
More inspections in OR
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336829981.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.