LAKE FOREST, IL —
OSHA Inspection: PERFORMANCE ROOFING SYSTEMS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PERFORMANCE ROOFING SYSTEMS, INC. in 28557 N. BALLARD DR., LAKE FOREST, IL 60045 (NAICS 238160). OSHA activity number 336997382.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PERFORMANCE ROOFING SYSTEMS, INC.
- Site address
- 28557 N. BALLARD DR.
- City
- LAKE FOREST
- State
- IL
- ZIP
- 60045
- Mailing
- P.O. BOX 187, RICHFIELD, WI 53076
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 2
- Ownership type
- A
Citations
3 citations on file for this inspection.
1926.502 F01
- Issued
- Nov 7, 2012
- Abate by
- Nov 14, 2012
- Penalty
- Initial $4,410 · Current $2,205 Reduced
General-duty citation text
29 CFR 1926.502(f)(1): Warning lines were not erected around all sides of the roof work area: a) Warning lines were not erected around all sides of the roof work area. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $2205
- — Z (S) $4410
1926.502 F01 III
- Issued
- Nov 7, 2012
- Abate by
- Nov 14, 2012
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(f)(1)(iii): Points of access, material handling areas, storage areas, and/or hoisting areas were not connected to the work area by an access path formed by two warning lines: a) Warning lines were not used to create access paths connecting the work area to the point of access along the roof edge. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B10
- Issued
- Nov 7, 2012
- Abate by
- Nov 14, 2012
- Penalty
- Initial $8,820 · Current $3,525 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs with unprotected sides and edges 6 feet or more above lower levels, was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: a) Employees were not protected from the hazard of falling approximately 19 feet from the roof edge while engaged in roofing activities without the benefit of fall protection or safety monitoring. Performance Roofing Systems, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501 (b)(10) which was contained in OSHA inspection number 109660, citation 1, item 1, issued on January 17, 2012, and became final order on or about February 8, 2012. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
- — I (R) $3525
- — Z (R) $8820
More inspections at Performance Roofing Systems, INC.
View Performance Roofing Systems, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 336997382.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.