OSHA Inspection: SOLAR ERECTORS U.S. INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of SOLAR ERECTORS U.S. INC. in 3800 NW 115TH AVE., DORAL, FL 33178 (NAICS 327390). OSHA activity number 337060180.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Solar Erectors U.S. INC. — free Get an email when a new federal OSHA severe-injury report for Solar Erectors U.S. INC. is published. One employer, no account, unsubscribe in one click.
Site address
3800 NW 115TH AVE.
City
DORAL
State
FL
ZIP
33178
Mailing
10501 NW 121 WAY, MEDLEY, FL 33178
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327390
Employees
65
Ownership type
A

2 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 120 exposed
Issued
Apr 8, 2013
Abate by
Apr 25, 2013
Penalty
Initial $6,930 · Current $6,930
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees when they were exposed to struck-by and caught-in-between hazards:      On or about 10/10/12, at the above addressed jobsite, employees were exposed to the risk of being struck by collapsing pre-cast structural members due to not ensuring that column B-3 was properly grouted.    Among other methods, one feasible and acceptable abatement method to correct this hazard is to follow and implement the Coreslab Erection Drawing E0.0  General Notes, Section 3.2 Welding, which requires welding of connections shall follow closely behind the erection of units.  Also, ensure Section 3.4 Grout and Solar Erectors erection procedure in the column section, item #4 are followed.         NOTE: ABATEMENT CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM.
Recent events (2)
  • — I (S) $6930
  • — Z (S) $6930

1926.704 A

Serious Gravity 10 1 instance 120 exposed
Issued
Apr 8, 2013
Abate by
Apr 25, 2013
Penalty
Initial $6,930 · Current $6,930
29 CFR 1926.704(a): Precast concrete wall units, structural framing and tilt-up wall panels were not adequately supported to prevent overturning and to prevent collapse until permanent connections were completed:    On or about 10/10/12, at the above addressed jobsite, employees were exposed to the risk of being struck-by collapsing pre-cast structural members due to column B-2 not being braced.    NOTE: ABETEMENT CERTIFICATION AND DOCUMENTATION IS REQUIRED FOR THIS ITEM.
Recent events (2)
  • — I (S) $6930
  • — Z (S) $6930

View Solar Erectors U.S. INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 337060180.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.