Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ISOTHERM, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ISOTHERM, INC. in 7401 COMMERCIAL BLVD. E, ARLINGTON, TX 76001 (NAICS 332410). OSHA activity number 338642432.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Isotherm, INC. — free Get an email when a new federal OSHA severe-injury report for Isotherm, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
ISOTHERM, INC.
Site address
7401 COMMERCIAL BLVD. E
City
ARLINGTON
State
TX
ZIP
76001
Mailing
7401 COMMERCIAL BLVD. E, ARLINGTON, TX 76001
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332410
Employees
25
Ownership type
A

6 citations on file for this inspection.

1910.178 P01

Serious Gravity 1 1 instance 1 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $1,200 · Current $600 Reduced
29 CFR 1910.178(p)(1): Powered industrial truck(s) found to be in need of repair, defective, or in any way unsafe had not been  taken out of service until restored to safe operating condition(s)    a) On or about January 18, 2013, center of production area, the seat on the Toyota 5000 pound forklift, model 6215, needed to be replaced/repaired, exposing employees to ergonomics hazards.
Recent events (2)
  • — I (S) $600
  • — Z (S) $1200

1910.212 A01

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by:    a) On or about January 18, 2013, in the tooling department,  employer did not provide a guard over the H.E.S. 12" Chuck Lathe,  exposing employees to the hazard of being struck by the jaws of the chuck.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1910.243 C01

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $2,000 · Current $800 Reduced
29 CFR 1910.243(c)(1): Abrasive wheel(s) were used on portable grinder(s) which were not provided with safety guard(s) meeting the requirements specified in 29 CFR 1910.243(c)(1) through (c)(4):    a) On or about January 18, 2013, east side of Production Area, the Milwaukee 4 1/2" Right Hand Angle Grinder was not equipped with a guard, exposing employees to the hazard of being struck by the abrasive wheel.
Recent events (2)
  • — I (S) $800
  • — Z (S) $2000

1910.303 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $2,400 · Current $1,200 Reduced
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment:    a) On or about January 18, 2013, in the installation department, the electrical control panels did not have a 3 foot clearance.  The electrical control panels were blocked by roller bins of metal supplies.
Recent events (2)
  • — I (S) $1200
  • — Z (S) $2400

1910.305 G02 II

Serious Gravity 10 1 instance 1 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $2,800 · Current $1,400 Reduced
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap:    a)On or about January 18, 2013, in the southeast corner of the shop,  the orange extension cord supplying power to a Makita Sander was severely cut and frayed and wrapped with black tape on several places on the cord, exposing employees to the hazard of electrical burns.
Recent events (2)
  • — I (S) $1400
  • — Z (S) $2800

1910.1200 E01

Serious Gravity 1 1 instance 2 exposed
Issued
Feb 8, 2013
Abate by
Mar 11, 2013
Penalty
Initial $1,200 · Current $600 Reduced
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met:    a) On or about January 18, 2013, there was no hazard communication program developed or maintained, when employees are using chemicals such as,  but not limited to, ValCool VP 650, and Sliderite 68 coolant oil, exposing employees to the hazard of skin irritations.
Recent events (2)
  • — I (S) $600
  • — Z (S) $1200

View Isotherm, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338642432.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.