OSHA Inspection: GRAPHIC MANAGEMENT SPECIALTY PRODUCTS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GRAPHIC MANAGEMENT SPECIALTY PRODUCTS INC. in 139 EVERGREEN ROAD, OCONTO, WI 54153 (NAICS 323111). OSHA activity number 338691835.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Graphic Management Specialty Products INC. — free Get an email when a new federal OSHA severe-injury report for Graphic Management Specialty Products INC. is published. One employer, no account, unsubscribe in one click.
Site address
139 EVERGREEN ROAD
City
OCONTO
State
WI
ZIP
54153
Mailing
139 EVERGREEN ROAD, OCONTO, WI 54153
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
323111
Employees
85
Ownership type
A

12 citations on file for this inspection.

1910.36 H01

Other-than-serious 3 instances 4 exposed
Issued
Feb 11, 2013
Abate by
Mar 19, 2013
Penalty
Initial $2,380 · Current $0 Reduced
29 CFR 1910.36(h)(1):     The outdoor exit route did not have guardrails to protect unenclosed sides where a fall hazard existed:    a)    Distribution Center emergency exits did not have guardrails at the exit doors for the east, west and north sides of the building. No stairs were provided at the north exit.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (S) $2380

1910.36 H02

Other-than-serious 3 instances 4 exposed
Issued
Feb 11, 2013
Abate by
Feb 20, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.36(h)(2):     The outdoor exit route was not covered if snow or ice was likely to accumulate along the route, unless the employer can demonstrate that any snow or ice accumulation will be removed before it presents a slipping hazard:    a)    Distribution Center emergency exits did not have snow removed at the exit doors for the east, west and north sides of the building.     NO ABATEMENT CERTIFICATION OR ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 10 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 19, 2013
Penalty
Initial $4,900 · Current $2,450 Reduced
29 CFR 1910.212(a)(1):     One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:    a)    Unguarded ingoing nip point between rollers for Flood Coats machine where injury had taken place in 2011.    b)    Unguarded ingoing nip points formed by steel and rubber embossing rolls on Flood Coat machine.    c)    Unguarded ingoing nip points formed by PIV rolls on Flood Coat machine.    d)    Unguarded ingoing nip points formed by analox roll from top side of Flood Coat machine.    e)    Unguarded ingoing nip points formed by tint sleeve and impression cylinder from bottom side of Flood Coat machine.    f)    Unguarded ingoing nip points approximately 17" from pressure rolls to electrical controls for DATM.    g)    Unguarded ingoing nip point on C.G. Bretting 1 lane lunch line emboss rolls from below.    h)    Unguarded ingoing nip point on C.G. Bretting 2 lane lunch line emboss rolls from below.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

1910.212 A03 II

Serious Gravity 10 4 instances 6 exposed
Issued
Feb 11, 2013
Abate by
Jun 1, 2013
Penalty
Initial $4,900 · Current $2,450 Reduced
29 CFR 1910.212(a)(3)(ii):     Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s):    a)    Approximately 5" wide unguarded access to flying knife roll for DATM machine approximately 3" behind pressure rolls.    b)    Senning wrapper #2, nip points formed by pusher plates are not guarded.     c)    Pizza label die cutter access not fully guarded, approximately 7" from hydraulic cylinder to knife on north and south side of equipment.    d)    Cassoli wrapper had unguarded nip point formed by pusher and compression plates.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $2450
  • — Z (S) $4900

1910.219 C02 I

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 19, 2013
Penalty
Initial $2,380 · Current $1,190 Reduced
29 CFR 1910.219(c)(2)(i):     All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting:      a)    Unguarded shaft for exhaust side fan approximately 6" from fan frame on Flood Coats machine.     ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $1190
  • — Z (S) $2380

1910.219 C04 II

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 15, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.219(c)(4)(ii):     The unused keyway(s) of projecting shaft end(s) were not filled up or covered:    a)    Unguarded shaft w/keyway in it coming out of PIV on Flood Coats machine.     ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 D01

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 19, 2013
Penalty
Initial $2,975 · Current $1,488 Reduced
29 CFR 1910.219(d)(1):     Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o):     a)    Partially guarded pulley and belt on main drive approximately 7" to 12" from side guard panel to nip point on Flood Coats machine.     ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $1487.5
  • — Z (S) $2975

1910.219 E03 I

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 15, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.219(e)(3)(i):     Vertical or inclined belt(s) were not enclosed by guard(s) conforming to the requirements specified at 29 CFR 1910.219(m) and (o):    a)    Partially guarded pulley and belt on main drive approximately 7" to 12" from side guard panel to nip point on Flood Coats machine.     ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 F01

Serious Gravity 5 2 instances 3 exposed
Issued
Feb 11, 2013
Abate by
Jun 1, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.219(f)(1):     Gear(s) were not guarded by a complete enclosure or by one of the methods specified in 29 CFR 1910.219(f)(1)(ii) and (f)(1)(iii):       a)    Exposed analox gear on sunday drive were not guarded on Flood Coats machine.    b)    Drive gears on back side of machine had only partial guarding with approximately 3" from frame to gears for Flood Coat machine.    c)    Drive gears on Wrapper #2 Senning were not guarded.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.219 F03

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 15, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven (7) feet or less above floors or platforms were not enclosed:      a)    Exposed chains and sprockets need guards on front side below machine approximately 24" into Flood Coats machine.    b)    Chains and sprockets on back side of machine for PIV drive are approximately 6" from frame and unguarded on Flood Coat machine.    c)    Guard door was off on the Heidelberg press #102 which exposed a chain and sprocket drive approximately 10" inside cabinet.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.303 F01

Serious Gravity 5 3 instances 6 exposed
Issued
Feb 11, 2013
Abate by
Mar 19, 2013
Penalty
Initial $2,380 · Current $1,190 Reduced
29 CFR 1910.303(f)(1):     Each disconnecting means required by Subpart S of Part 1910 for motors and appliances was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident:    a)    Siemens disconnects for Drent were not labeled.    b)    Mark Andy disconnects were not labeled.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $1190
  • — Z (S) $2380

1910.305 G01 IV B

Serious Gravity 5 1 instance 3 exposed
Issued
Feb 11, 2013
Abate by
Mar 15, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(B): Where use was not permitted by paragraph (g)(1)(ii), flexible cords and cables were run through holes in walls, ceilings, or floors;    a)    Miller Welder Disconnect 208/1 phase Feed from Panel RM was run through the wall in the shop.    ABATEMENT CERTIFICATION AND ABATEMENT DOCUMENTATION REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View Graphic Management Specialty Products INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338691835.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.