CINCINNATI, OH —
OSHA Inspection: DYNAMIC CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DYNAMIC CONSTRUCTION in 5410 RIDGE AVE., CINCINNATI, OH 45213 (NAICS 236118). OSHA activity number 338928534.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DYNAMIC CONSTRUCTION
- Site address
- 5410 RIDGE AVE.
- City
- CINCINNATI
- State
- OH
- ZIP
- 45213
- Mailing
- 790 SPRING FOREST DR., LAWRENCEVILLE, GA 30043
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 5
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.20 B01
- Issued
- Mar 8, 2013
- Abate by
- Apr 24, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1926.20(b)(1): It shall be the responsibility of the employer to initiate and maintain such programs as may be necessary to comply with this part. 1. At the motel entranceway under construction, the employer had no safety and health program implimented for employees to follow that were involved with construction activity.
Recent events (2)
- — I (S) $600
- — Z (S) $1200
1926.21 B02
- Issued
- Mar 8, 2013
- Abate by
- Apr 24, 2013
- Penalty
- Initial $1,200 · Current $0 Reduced
General-duty citation text
29 CFR 1926.21(b)(2): The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury. 1. At the entranceway to the motel under construction, laborors had not received any training in the hazards associated with electrical, scaffolding safety and personal protective equipment to be worn.
Recent events (2)
- — I (S) $0
- — Z (S) $1200
1926.102 A01
- Issued
- Mar 8, 2013
- Abate by
- Mar 14, 2013
- Penalty
- Initial $2,400 · Current $400 Reduced
General-duty citation text
29 CFR 1926.102(a)(1): Employees shall be provided with eye and face protection equipment when machines or operations present potential eye or face injury from physical, chemical, or radiation agents. 1. Under the entranceway to the motel being remodeled, laboror(s) were using a DeWalt chop saw to cut metal studs with no eye protection being worn.
Recent events (2)
- — I (O) $400
- — Z (S) $2400
1926.404 B01 I
- Issued
- Mar 8, 2013
- Abate by
- Mar 14, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.404(b)(1)(i): The employer shall use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites. 1. At the entrancewqy to the existing motel, laboror(s) were using (2) extension cords for powering portable tools with no GFCI or AEGCP in use.
Recent events (2)
- — I (S) $900
- — Z (S) $2000
1926.404 F06
- Issued
- Mar 8, 2013
- Abate by
- Mar 14, 2013
- Penalty
- Initial $2,000 · Current $0 Reduced
General-duty citation text
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. 1. At the entranceway to the motel under construction, laboror(s) were exposed to an electrical shock hazard due to the use of (2) extension cords that were ungrounded.
Recent events (2)
- — I (S) $0
- — Z (S) $2000
1926.451 B01
- Issued
- Mar 8, 2013
- Abate by
- Mar 14, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: 1. At the entranceway to the motel under remodeling, laboror(s) were exposed to fall hazards of 11 feet, 6 inches due to the tubular welded frame scaffold being worked from not being planked solid.
Recent events (2)
- — I (S) $900
- — Z (S) $2000
1926.451 G01
- Issued
- Mar 8, 2013
- Abate by
- Mar 14, 2013
- Penalty
- Initial $2,000 · Current $900 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level. Paragraphs (g)(1)(i) through (vii) of this section establish the types of fall protection to be provided to the employees on each type of scaffold. Paragraph (g)(2) of this section addresses fall protection for scaffold erectors and dismantlers. 1. At the entranceway to the motel under construction, laboror(s) were exposed to an 11 feet, 6 inch fall hazard from the tubular welded frame scaffold being worked from due to no means of fall protection in use.
Recent events (2)
- — I (S) $900
- — Z (S) $2000
More inspections at Dynamic Construction
View Dynamic Construction's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338928534.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.