GLENVILLE, NY —
OSHA Inspection: CONBOY & MANNION CONTRACTING, INC
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of CONBOY & MANNION CONTRACTING, INC in 8 GLENRIDGE ROAD, GLENVILLE, NY 12302 (NAICS 236220). OSHA activity number 338929102.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CONBOY & MANNION CONTRACTING, INC
- Site address
- 8 GLENRIDGE ROAD
- City
- GLENVILLE
- State
- NY
- ZIP
- 12302
- Mailing
- 36 PHILA STREET, SARATOGA SPRINGS, NY 12866
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 20
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 B01
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $1,600 · Current $1,300 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) On or about February 25, 2013 and at times prior thereto at the work site; the subcontractors employees were performing EFIS work on a tubular scaffold that had 1-2 missing planks throughout each section.
Recent events (2)
- — I (S) $1300
- — Z (S) $1600
1926.451 G04 IV
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(g)(4)(iv): Midrails were not installed at a height approximately midway between the top edge of the guardrail system and the platform surface: On or about February 25, 2013 and at times prior thereto at the work site; employees were working from a scaffold that did not have midrails installed.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.452 B02
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.452(b)(2): Transverse bracing forming an "X" across the width of the scaffold was not installed at the scaffold ends and at least at every third set of posts horizontally (measured from only one end) and every fourth runner vertically. Bracing did not extend diagonally from the inner or outer posts or runners upward to the next outer or inner posts or runners: On or about February 25, 2013 and at times prior thereto at the work site; employees were working from a scaffold that was missing crossbracing on the entire inside of the scaffolding.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.451 E01
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used: a) On or about February 25, 2013 and at times prior thereto at the work site; the subcontractors employees were using crossbracing as a means of access to and from the scaffold platforms of the second and third level.
Recent events (2)
- — I (O) $0
- — Z (S) $1600
1926.451 F03
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $1,600 · Current $1,300 Reduced
General-duty citation text
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: a) On or about February 25, 2013 and at times prior thereto at the jobsite; the scaffold was not inspected by someone who would be considered a competent person.
Recent events (2)
- — I (S) $1300
- — Z (S) $1600
1926.454 B
- Issued
- May 6, 2013
- Abate by
- May 14, 2013
- Penalty
- Initial $1,200 · Current $1,000 Reduced
General-duty citation text
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question: a) On or about February 25, 2013 and at times prior thereto at the jobsite; subcontractor employees involved in operating, maintaining, and inspecting the scaffold system were not trained by a competent person.
Recent events (2)
- — I (S) $1000
- — Z (S) $1200
More inspections at Conboy & Mannion Contracting, INC
View Conboy & Mannion Contracting, INC's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338929102.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.