OSHA Inspection: E & R ERECTORS

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of E & R ERECTORS in MAIN ST AND SHEWELL AVE, DOYLESTOWN, PA 18901 (NAICS 238120). OSHA activity number 338981301.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch E & R Erectors — free Get an email when a new federal OSHA severe-injury report for E & R Erectors is published. One employer, no account, unsubscribe in one click.
Establishment
E & R ERECTORS
Site address
MAIN ST AND SHEWELL AVE
City
DOYLESTOWN
State
PA
ZIP
18901
Mailing
2526 STATE ROAD, BENSALEM, PA 19020
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238120
Employees
11
Ownership type
A

6 citations on file for this inspection.

1926.502 D23

Deleted Serious Gravity 5 1 instance 2 exposed
Issued
Jun 17, 2013
Penalty
Initial $2,023 · Current $0 Reduced
29 CFR 1926.502(d)(23): Personal fall arrest systems were attached to guardrail systems or to hoists:   a) Construction site, Penthouse level - On or about March 27, 2013, employees were anchoring retractable lifeline(s) to the post of a wire rope (perimeter safety cable) guardrail as part of their fall protection system.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2023

1926.760 A02

Other-than-serious 1 instance 1 exposed
Issued
Jun 17, 2013
Penalty
Initial $2,529 · Current $2,529
29 CFR 1926.760(a)(2): Perimeter safety cables were not installed on final interior and exterior perimeters on the floors as soon as the metal decking was installed.    a) Construction site, penthouse level - On or about March 27, 2013, safety cables were not erected around the entire perimeter while employees engaged in steel erection activities defined in 1926.750(b)(1).    b) Construction site, penthouse level - On or about March 27, 2013, safety cables were not erected to serve as midrails around the interior perimeter openings in the framing for elevator shafts, while employees engaged in steel erection activities defined in 1926.750(b)(1).
Recent events (2)
  • — I (O) $2529
  • — Z (S) $2529

1926.760 D03

Other-than-serious 1 instance 1 exposed
Issued
Jun 17, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.760(d)(3):    Perimeter safety cables did not meet the criteria for guardrail systems specified in CFR29 1926.502 referenced in 29 CFR, Subpart R, Appendix G:        a) Construction site, penthouse level - On or about March 27, 2013, perimeter safety cables erected around this floor had not been tensioned to prevent sagging below the minimum of 39 inches above the deck while employees engaged in steel erection activities defined in 1926.750(b)(1).
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.760 D02

Other-than-serious 1 instance 1 exposed
Issued
Jun 17, 2013
Penalty
Initial $1,517 · Current $1,517
29 CFR 1926.760(d)(2): Fall arrrest system components used in fall restraint systems did not conform to the criteria in 1926.502 (see Appendix G):    a) Construction site, penthouse level - On or about March 27, 2013, employees utilized wire rope chokers, as an attachment to tie off their PFAS system to structural beams, in a manner that would allow them to free fall more than 6 feet and contact the next lower level.
Recent events (2)
  • — I (O) $1517
  • — Z (S) $1517

1926.761 C02 II

Other-than-serious 1 instance 1 exposed
Issued
Jun 17, 2013
Abate by
Aug 15, 2013
Penalty
Initial $405 · Current $405
29 CFR 1926.761(c)(2)(ii): The employee did not ensure that all workers conducting connecting work were properly trained in it's establishment, access, proper techniques, and other work practices:  a) Construction site, penthouse level - On or about March 27, 2013, connectors were not properly trained in the related access methods, proper techniques, and other work practices.
Recent events (2)
  • — I (O) $404.6
  • — Z (O) $404.6

1926.761 C03 II

Other-than-serious 1 instance 1 exposed
Issued
Jun 17, 2013
Abate by
Aug 15, 2013
Penalty
Initial $405 · Current $405
29 CFR 1926.761(c)(3)(ii): The employee did not ensure that all workers within a controlled decking zone were properly trained in it's establishment, access, proper techniques, and other work practices:  a) Construction site, penthouse level - On or about March 27, 2013, workers within the controlled decking zone were not properly trained in it's establishment, access, proper techniques, and other work practices.
Recent events (2)
  • — I (O) $404.6
  • — Z (O) $404.6

View E & R Erectors's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 338981301.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.