COLUMBUS, OH ·
OSHA Inspection: SAUP/HARTLEY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of SAUP/HARTLEY in 1972 NORTH HIGH STREET, COLUMBUS, OH 43201 (NAICS 238160). OSHA activity number 339003501.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SAUP/HARTLEY
- Site address
- 1972 NORTH HIGH STREET
- City
- COLUMBUS
- State
- OH
- ZIP
- 43201
- Mailing
- 1950 EAST PIKE, ZANESVILLE, OH 43701
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 15
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
1926.453 B02 IV
- Issued
- Apr 24, 2013
- Abate by
- May 6, 2013
- Penalty
- Initial $3,080 · Current $2,156 Reduced
General-duty citation text
29 CFR 1926.453(b)(2)(iv): Employees shall always stand firmly on the floor of the basket, and shall not sit or climb on the edge of the basket or use planks, ladders, or other devices for a work position. On or about April 12, 2013 at the workplace, the employer did not ensure that employees not climb and/or sit on the JLG Aerial Lift while performing roofing work, thereby exposing employees to approximate 21 foot fall hazard.
Recent events (2)
- · I (S) $2156
- · Z (S) $3080
1926.453 B02 V
- Issued
- Apr 24, 2013
- Abate by
- May 6, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.453(b)(2)(v): A body belt shall be worn and a lanyard attached to the boom or basket when working from an aerial lift. a) On or about April 12, 2013 at the worksite, the employer did not ensure that employees were provided and used fall protection while performing roofing/trim work from a JLG Aerial Lift, thereby exposing employees to an approximate 21 foot fall hazard.
Recent events (2)
- · I (S) $0
- · Z (S) $0
1926.454 C
- Issued
- Apr 24, 2013
- Abate by
- May 20, 2013
- Penalty
- Initial $1,320 · Current $924 Reduced
General-duty citation text
29 CFR 1926.454(c): When the employer has reason to believe that an employee lacks the skill or understanding needed for safe work involving the erection, use or dismantling of scaffolds, the employer shall retrain each such employee so that the requisite proficiency is regained. Retraining is required in at least the following situations: 29 CFR 1926.454(c)(3): Where inadequacies in an affected employee's work involving scaffolds indicate that the employee has not retained the requisite proficiency. a) On or about April 12, 2013 at the worksite, the employer did not ensure that employees performing roofing/trim work were clear on the requirements for the use of fall protection while working from a JLG Aerial Lift.
Recent events (2)
- · I (S) $924
- · Z (S) $1320
More inspections at Saup/Hartley
View Saup/Hartley's full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339003501.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.