CHICAGO, IL —
OSHA Inspection: CRESTONE GROUP, LLC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CRESTONE GROUP, LLC. in 2711 W. GEORGE STREET, CHICAGO, IL 60618 (NAICS 311812). OSHA activity number 339021370.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CRESTONE GROUP, LLC.
- Site address
- 2711 W. GEORGE STREET
- City
- CHICAGO
- State
- IL
- ZIP
- 60618
- Mailing
- 2711 W. GEORGE STREET, CHICAGO, IL 60618
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311812
- Employees
- 42
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C06 I
- Issued
- May 2, 2013
- Abate by
- Jun 5, 2013
- Penalty
- Initial $4,250 · Current $2,550 Reduced
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) Facility Wide - An annual or more frequent inspection of the energy control procedures to ensure that the procedure and requirements of this standard were being followed was not being completed and certified. In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2550
- — Z (S) $4250
1910.178 L04 III
- Issued
- May 2, 2013
- Abate by
- Jun 5, 2013
- Penalty
- Initial $4,250 · Current $2,550 Reduced
General-duty citation text
29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: (a) Facility Wide - On or about April 24, 2013, the employer failed to conduct an evaluation of each powered industrial truck operator's performance at least once in the past three years. In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2550
- — Z (S) $4250
1910.219 F03
- Issued
- May 2, 2013
- Abate by
- Jun 5, 2013
- Penalty
- Initial $4,250 · Current $2,550 Reduced
General-duty citation text
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven feet or less above floors or platforms were not enclosed: (a) Rheon Dough Feeding Conveyor Area - The dough trough lift (1107) had sprocket wheels and chains which were not enclosed. In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $2550
- — Z (S) $4250
1910.263 C03
- Issued
- May 2, 2013
- Abate by
- Jun 5, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.263(c)(3): Sprocket(s) and V-belt drive(s) of bakery machinery located within reach from platform(s) or passageway(s) or located within 8 feet 6 inches from the floor were not completely enclosed: (a) Rheon dough feeding conveyor area - The dough trough lift (1107) had sprockets that were not completely enclosed. In accordance with 29CFR 1903.19(c), abatement certification is required for this violation (using CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- — I (S) $0
- — Z (S) $0
More inspections at Crestone Group, LLC.
View Crestone Group, LLC.'s full OSHA safety record →
More inspections in this industry (NAICS 311812)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339021370.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.