Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ASI

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ASI in 529 14TH ST, WASHINGTON, DC 20045 (NAICS 562910). OSHA activity number 339088940.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ASI — free Get an email when a new federal OSHA severe-injury report for ASI is published. One employer, no account, unsubscribe in one click.
Establishment
ASI
Site address
529 14TH ST
City
WASHINGTON
State
DC
ZIP
20045
Mailing
7585 WASHINGTON BOULEVARD # 104, ELKRIDGE, MD 21075
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
562910
Employees
20
Ownership type
A

4 citations on file for this inspection.

5(a)(1)

Deleted Serious Gravity 5 1 instance 10 exposed
Issued
Nov 19, 2013
Abate by
Dec 9, 2013
Penalty
Initial $2,400 · Current $0 Reduced
OSH ACT of 1970 Section (5)(a)(1): The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees:   On May 21, 2013 and at times prior thereto; throughout site; employees were exposed to carbon monoxide fumes while the operation of a motorized floor scraper during an asbestos remediation project. The motorized Hurricane scraper used in the removal of vinyl or asphalt floor tiles and mastic adhesive was not properly maintained as directed by the manufacturer's operating manual.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2400

1926.20 B04

Other-than-serious 1 instance 2 exposed
Issued
Nov 19, 2013
Abate by
Dec 9, 2013
Penalty
Initial $1,600 · Current $1,200 Reduced
29 CFR 1926.20(b)(4): The employer did not ensure that the employee(s) required to operate equipment and machinery was qualified by training or experience.     a) On May 21, 2013 and at times prior thereto; throughout site; employees were not trained on the safe operational procedures of the ride-on scraper prior to instructing them to operate the equipment to remove the vinyl or asphalt floor tiles and mastic adhesive.        Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (O) $1200
  • — Z (S) $1600

1926.404 B01 II

Deleted Serious Gravity 5 1 instance 3 exposed
Issued
Nov 19, 2013
Abate by
Dec 16, 2013
Penalty
Initial $1,600 · Current $0 Reduced
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection   a) On May 21, 2013 and at times prior thereto; first floor, portable electrical equipment such as but not limited to fans were not protected with a ground fault circuit interrupter that would protect them from electrical shock in the event that the portable tools used in the process became damaged.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1600

1926.404 F06

Deleted Serious Gravity 1 2 instances 2 exposed
Issued
Nov 19, 2013
Abate by
Dec 16, 2013
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous:   a) On May 21, 2013 and at times prior thereto; throughout site; the extension cords used by the employees to provide power to the portable electrical equipment such as, but not limited to, fans were missing the ground pin.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

View ASI's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339088940.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.