CINCINNATI, OH —
OSHA Inspection: TRUITT CONSTRUCTION, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TRUITT CONSTRUCTION, INC. in 9681 COLERAIN, CINCINNATI, OH 45251 (NAICS 238140). OSHA activity number 339141418.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TRUITT CONSTRUCTION, INC.
- Site address
- 9681 COLERAIN
- City
- CINCINNATI
- State
- OH
- ZIP
- 45251
- Mailing
- 13793 ERDMAN RD, BEAR LAKE, MI 49614
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 5
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 B02
- Issued
- Jul 23, 2013
- Abate by
- Jul 29, 2013
- Penalty
- Initial $2,400 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide: a)There was an employee observed working from a 9 1/2" wide scaffold plank work platfrom without conventional fall protection exposed to a fall potential in excess of 9' supported between an elevated JCB rough terrain forklift mast/fork with attached loaded pallett and an adjacent self-supported tubular welded frame scaffold system.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
1926.602 D
- Issued
- Jul 23, 2013
- Abate by
- Jul 31, 2013
- Penalty
- Initial $2,400 · Current $1,200 Reduced
General-duty citation text
29 CFR 1926.602(d): The employer did not certify that each operator had been trained and evaluated as required by paragraph 29 CFR 1910.178(l):Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178. a) An employee/operator elevated a JCB rough terrain forkllift mast/forks and taaached loded p[allet with an unprotected employee occupied single scaffold plank placed to an adjacent self-supported tubular welded frame scaffold system. The forklift operator performing the duties was not trained on the workplace hazards associated with forklift operation and the requirements of this regulation.
Recent events (2)
- — I (S) $1200
- — Z (S) $2400
More inspections at Truitt Construction, INC.
View Truitt Construction, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339141418.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.