On , OSHA opened a planned safety inspection of VICTORIA E.R. GENERAL SERVICES LLC in 2718 HAMLIN ST., NE, WASHINGTON, DC 20018 (NAICS 238130). OSHA activity number 339173148.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- VICTORIA E.R. GENERAL SERVICES LLC
- Site address
- 2718 HAMLIN ST., NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 2509 URBANA DR., SILVER SPRING, MD 20906
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 5
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.100 A
- Issued
- Aug 14, 2013
- Abate by
- Aug 20, 2013
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not protected by protective helmets. a) Employees on the ground below trusses being hoisted did not have head protection, exposed to falling objects, on or about 07/10/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2000
1926.150 C01 IV
- Issued
- Aug 14, 2013
- Abate by
- Aug 20, 2013
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.150(c)(1)(iv): One or more fire extinguishers, rated not less than 2A, were not provided on each floor. a) No fire extinguisher are on-site and saws and gas powered generators are used, exposing employees to a fire hazard, on or about 07/10/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1200
1926.501 B13
- Issued
- Aug 14, 2013
- Abate by
- Aug 20, 2013
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.501(b)(13):Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system: a) Employees without fall protection were leaning out and standing in windows with the sill, 24 inches in height, exposing them to a fall of approximately 17 foot 10 inch, on or about 07/10/13. b) Employees without fall protection were exposed to a fall hazard of approximately 9 feet 1 inch from the top-plate to the floor and approximately 25 feet from the top-plate to the ground, on or about 07/10/13. c) Employees hoisting trusses up to the top-plate without fall protection were exposed to a fall hazard of approximately 9 feet 1 inch from the top-plate to the floor and approximately 25 feet from the top-plate to the ground, on or about 07/10/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
- — Z (S) $2800
1926.1052 C01 I
- Issued
- Aug 14, 2013
- Abate by
- Aug 20, 2013
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: a) Employees use a set of stairs 13 risers in height without a handrail exposed to a fall hazard, on or about 07/10/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $1200
More inspections at Victoria E.R. General Services LLC
View Victoria E.R. General Services LLC's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339173148.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.