OSHA Inspection: TRIDENT BUILDING SYSTEMS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of TRIDENT BUILDING SYSTEMS, INC. in 2812 TALLEVAST RD, SARASOTA, FL 34243 (NAICS 332311). OSHA activity number 339175069.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Trident Building Systems, INC. for free Get an email when a new federal OSHA severe-injury report for Trident Building Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
2812 TALLEVAST RD
City
SARASOTA
State
FL
ZIP
34243
Mailing
2812 TALLEVAST RD, SARASOTA, FL 34243
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
332311
Employees
92
Ownership type
Private (A)

9 citations on file for this inspection.

1910.147 C04 I

Deleted Serious Gravity 1 1 instance 2 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $1,890 · Current $0 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  (a) At the forming department, PBR (Purllin Bearing Roof),  Roller machine used to fabricate wall and roof panels did not have lock out/tag out procedures when maintenance employees did maintenance and repairs, on or about July 31, 2013.
Recent events (3)
  • · R (S) $0
  • · C (S) $1890
  • · Z (S) $1890

1910.157 G02

Other-than-serious 1 instance 30 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $1,890 · Current $1,417 Reduced
29 CFR 1910.157(g)(2): The educational program to familiarize employees with the general principles of fire extinguisher use and the hazards involved with incipient stage fire fighting was not provided to all employees upon initial employment, and at least annually thereafter:    (a) At the establishment, employees were not trained annually on the principles of fire extinguishers use, on or about July 31, 2013.
Recent events (3)
  • · R (O) $1417
  • · C (S) $1890
  • · Z (S) $1890

1910.215 A04

Serious Gravity 5 1 instance 2 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $3,150 · Current $3,150
29 CFR 1910.215(a)(4): Grinding machinery was not used with work rest(s) to support offhand grinding work:      (a)At the maintenance shop, a Delta 8" bench grinder, Model 23-880, was not equipped with a work rest, on or about July 30, 2013.
Recent events (3)
  • · R (S) $3150
  • · C (S) $3150
  • · Z (S) $3150

1910.215 B09

Serious Gravity 5 1 instance 2 exposed
Issued
Nov 4, 2013
Penalty
Initial $3,150 · Current $0 Reduced
29 CFR 1910.215(b)(9): The distance between the abrasive wheel periphery(s) and the adjustable tongue or the end of the safety guard peripheral member at the top exceeded one fourth inch:     (a) At the maintenance shop, the tongue guard of a Delta 8" bench grinder, Model 23-880, exceed one forth inch. The tongue guard measured 1" from the wheel, on or about July 30, 2013.
Recent events (3)
  • · R (S) $0
  • · C (S) $3150
  • · Z (S) $3150

1910.253 B04 III

Serious Gravity 5 7 instances 3 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $3,150 · Current $3,150
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour:    (a) At the compressed storage area, oxygen tanks were stored beside acetylene tanks, on or about July 30, 2013.
Recent events (3)
  • · R (S) $3150
  • · C (S) $3150
  • · Z (S) $3150

1910.23 D01 IV

Other-than-serious 1 instance 6 exposed
Issued
Nov 4, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.23(d)(1)(iv): The employer did not ensure that stairs with four or more risers that were more than 44 inches wide but less than 88 inches wide had a stair railing on each open side and a handrail on each enclosed side.     a) At the loading dock, the stair leading to the parking lot, had four risers and 45 inches wide, without intermediate rail, on or about July 31, 2013.
Recent events (3)
  • · R (O) $0
  • · C (O) $0
  • · Z (O) $0

1910.38 F

Deleted Other-than-serious 1 instance 30 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.38(f): 29 CFR 1910.38(f): The employer did not review the emergency action plan with each employee covered by the plan in accordance with 1910.38(f)(1) through (f)(3).  a) At the establishment, employees were not aware where to meet in case of emergency evacuation, or on about July 31, 2013.
Recent events (3)
  • · R (O) $0
  • · C (O) $0
  • · Z (O) $0

1910.39 C

Other-than-serious 1 instance 92 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $0 · Current $0
29 CFR 1910.39(c): A fire prevention plan did not include the minimum elements:    a) At the establishment, the fire prevention plan did not include the following elements, on or about July 31, 2013:    1. A list of all major fire hazards, proper handling and storage procedures for hazardous materials, potential ignition sources and their control, and the type of fire protection equipment necessary to control each major hazard;    2. Procedures to control accumulations of flammable and combustible waste materials;     3. Procedures for regular maintenance of safeguards installed on heat-producing equipment to prevent the accidental ignition of combustible materials;     4. The name or job title of employees responsible for maintaining equipment to prevent or control sources of ignition or fires; and    5. The name or job title of employees responsible for the control of fuel source hazards.
Recent events (3)
  • · R (O) $0
  • · C (O) $0
  • · Z (O) $0

1910.147 C06 I

Other-than-serious 1 instance 2 exposed
Issued
Nov 4, 2013
Abate by
Dec 23, 2013
Penalty
Initial $630 · Current $630
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:    a) At the production area, machines such as but not limited to Geica, on or about July 30, 2013.
Recent events (3)
  • · R (O) $630
  • · C (O) $630
  • · Z (O) $630

View Trident Building Systems, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339175069.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.