WASHINGTON, DC ·
OSHA Inspection: AJP BUILDERS, LLC
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of AJP BUILDERS, LLC in 3812 25TH PL., NE, WASHINGTON, DC 20018 (NAICS 236118). OSHA activity number 339210478.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- AJP BUILDERS, LLC
- Site address
- 3812 25TH PL., NE
- City
- WASHINGTON
- State
- DC
- ZIP
- 20018
- Mailing
- 1116 UNIVERSITY BLVD. WEST, SILVER SPRING, MD 20902
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 6
- Ownership type
- Private (A)
Citations
5 citations on file for this inspection.
1926.100 A
- Issued
- Aug 15, 2013
- Abate by
- Aug 21, 2013
- Penalty
- Initial $1,600 · Current $800 Reduced
General-duty citation text
29 CFR 1926.100(a): Employees working in areas where there is a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns, were not protected by protective helmets. a) Employees removing the roof trusses and sheathing were not wearing head protection while working below this operation, exposed to falling object hazards, on or about 07/18/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $800
- · Z (S) $1600
1926.405 B02
- Issued
- Aug 15, 2013
- Abate by
- Aug 21, 2013
- Penalty
- Initial $1,200 · Current $600 Reduced
General-duty citation text
29 CFR 1926.405(b)(2): In energized installations, each outlet box did not have a cover, faceplate, or fixture canopy: a) An employee was using an energized outlet with no cover on the first floor to power an air compressor and reciprocating saw exposed to electrical hazards, on or about 07/18/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $600
- · Z (S) $1200
1926.501 B13
- Issued
- Aug 15, 2013
- Abate by
- Aug 21, 2013
- Penalty
- Initial $2,800 · Current $1,400 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system: a) Employees were on the second floor where there was no wall in place without any fall protection while being exposed to a fall of 10 feet to the concrete porch and 18 feet to the ground below, on or about 07/18/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
- · I (S) $1400
- · Z (S) $2800
1926.503 A01
- Issued
- Aug 15, 2013
- Abate by
- Sep 11, 2013
- Penalty
- Initial $2,000 · Current $800 Reduced
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee who might be exposed to fall hazards. a) Employees were not trained in the use of fall protection when working on the second floor and exposed to a fall of 10 feet to the concrete porch and 18 feet to the ground below, on or about 07/18/13. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $800
- · Z (S) $2000
1926.21 B02
- Issued
- Aug 15, 2013
- Abate by
- Sep 11, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury. a) Employees working around electrical hazards and not using head protection when required have no training in safety or avoidance of unsafe conditions, on or about 07/18/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- · I (S) $0
- · Z (S) $0
More inspections at AJP Builders, LLC
View AJP Builders, LLC's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339210478.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.