SAINT CHARLES, MO —
OSHA Inspection: RELIANCE TOOL & ENGINEERING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of RELIANCE TOOL & ENGINEERING in 1779 SCHERER PARKWAY, SAINT CHARLES, MO 63303 (NAICS 332999). OSHA activity number 339213431.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RELIANCE TOOL & ENGINEERING
- Site address
- 1779 SCHERER PARKWAY
- City
- SAINT CHARLES
- State
- MO
- ZIP
- 63303
- Mailing
- 1779 SCHERER PARKWAY, SAINT CHARLES, MO 63303
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- Employees
- 15
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.106 E06 II
- Issued
- Sep 30, 2013
- Abate by
- Nov 18, 2013
- Penalty
- Initial $1,020 · Current $714 Reduced
General-duty citation text
29 CFR 1910.106(e)(6)(ii): Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), were dispensed into containers without the nozzle and container being electrically interconnected: In the Chemical Storage Room, the 55-gallon drum of acetone in the flammable storage cabinet used for dispensing was not grounded and bonded.
Recent events (2)
- — I (S) $714
- — Z (S) $1020
1910.1200 E01
- Issued
- Sep 30, 2013
- Abate by
- Jan 20, 2014
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met: In the shop, for employees who used chemicals including but not limited to, acetone and lubricants, a written hazard communication program had not been developed.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.1200 F05
- Issued
- Sep 30, 2013
- Abate by
- Nov 18, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.1200(f)(5): The employer did not ensure that each container of hazardous chemicals in the workplace was labeled, tagged, or marked with the identity and appropriate hazard warnings regarding the chemicals contained therein: Back Room, the plastic bottle(s) of acetone used to wipe parts daily was not labeled.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.303 B02
- Issued
- Sep 30, 2013
- Abate by
- Mar 3, 2014
- Penalty
- Initial $1,020 · Current $714 Reduced
General-duty citation text
29 CFR 1910.303(b)(2) Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: 1) Front room, near the #1 manual cyclindrical grinder, the knockout receptacle outlet box on a pendant used to serivice a light was not used according to the manufacturer's instructions for listing or labelling. 2) Back room, near the tool maker bench, the knockout receptacle outlet box on a pendant used to service a light was not used according to the manufacturer's instructions for listing or labelling. 3) Back room, near the OKUMA CADET lathe, the knockout receptacle outlet box on a pendant used to serivice a radio and fan was not used according to the manufacturer's instructions for listing or labelling.
Recent events (2)
- — I (S) $714
- — Z (S) $1020
1910.304 G05
- Issued
- Sep 30, 2013
- Abate by
- Nov 18, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.304(g)(5) The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: In the back room by the tool maker bench, the cord and plug servicing the light was missing a ground pin.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.178 L04 III
- Issued
- Sep 30, 2013
- Abate by
- Nov 18, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not being conducted at least once every three years: For the forklift operators who had not had performance evaluations in the last three years.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at Reliance Tool & Engineering
View Reliance Tool & Engineering's full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339213431.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.