WASHINGTON, DC —
OSHA Inspection: JOSE ESTRADA
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of JOSE ESTRADA in 2446 ONTARIO STREET, NW, WASHINGTON, DC 20009 (NAICS 236118). OSHA activity number 339268500.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- JOSE ESTRADA
- Site address
- 2446 ONTARIO STREET, NW
- City
- WASHINGTON
- State
- DC
- ZIP
- 20009
- Mailing
- 12605 GRACEMAX STREET, ROCKVILLE, MD 20853
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236118
- Employees
- 2
- Ownership type
- A
Citations
7 citations on file for this inspection.
1926.20 B01
- Issued
- Sep 4, 2013
- Abate by
- Oct 22, 2013
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.20(b)(1): The employer did not initiate and maintain such programs as may be necessary to comply with this part: a) Job Site - The employer had not developed a safety and health program as evidenced by hazards such as but not limited to electrical hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $1600
1926.21 B02
- Issued
- Sep 4, 2013
- Abate by
- Oct 22, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury: a) Job Site - Employees were not provided hazard recognition as evidenced by noted hazards such as but not limited to electrical hazards on or about 08/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.403 D01
- Issued
- Sep 4, 2013
- Abate by
- Sep 10, 2013
- Penalty
- Initial $1,600 · Current $800 Reduced
General-duty citation text
29 CFR 1926.403(d)(1): Electric equipment was not firmly secured to the surface on which it was mounted: a) Fourth Floor - An employee was using a heat gun that was plugged into a 4-way outlet that was lying on the floor and not mounted, 110 volt, 15 amp service, on or about 08/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $800
- — Z (S) $1600
1926.404 B01 I
- Issued
- Sep 4, 2013
- Abate by
- Sep 10, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.404(b)(1)(i): Employer did not use either ground fault circuit interrupters as specified in paragraph (b)(1)(ii) of this section, or an assured equipment grounding conductor program as specified in paragraph (b)(1)(iii) of this section to protect employees on construction sites: a) Fourth Floor - Employee using an electric heat gun installing a vinyl membrane and not provided a ground fault circuit interrupter, 110 volt, 15 amp service, on or about 08/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.501 B13
- Issued
- Sep 4, 2013
- Abate by
- Sep 10, 2013
- Penalty
- Initial $2,000 · Current $1,500 Reduced
General-duty citation text
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b): a) Exterior at Fourth Floor Windows - An employee was observed installing a vinyl membrane while on an 18 inch wide ledge and exposed to a 30' fall hazard, on or about 08/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $1500
- — Z (S) $2000
1926.502 D17
- Issued
- Sep 4, 2013
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(17): The attachment point of the body harness was not located in the center of the wearer's back near shoulder level, or above the wearer's head: a) Exterior at Fourth Floor Windows - An employee was observed wearing personal fall arrest equipment with the attachment point located in the front while installing a vinyl membrane on an 18 inch ledge 30 feet above the ground, on or about 08/08/13.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1926.1052 C01 I
- Issued
- Sep 4, 2013
- Abate by
- Sep 10, 2013
- Penalty
- Initial $1,600 · Current $0 Reduced
General-duty citation text
29 CFR 1926.1052(c)(1)(i): Stairways having four or more risers or rising more than 30 inches (76 cm), whichever is less, were not equipped with at least one handrail: a) Main Stairway - Employees were using a stairway that was 40 inches wide with 15 risers, with a total rise of 10 feet, to gain access to the 4th floor, and a handrail was not provided, on or about 08/08/13. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $0
- — Z (S) $1600
More inspections at Jose Estrada
View Jose Estrada's full OSHA safety record →
More inspections in this industry (NAICS 236118)
More inspections in DC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339268500.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.