OSHA Inspection: PAUL BUNYAN PRODUCTS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PAUL BUNYAN PRODUCTS INC. in 7101 NYS ROUTE 281, PREBLE, NY 13141 (NAICS 321920). OSHA activity number 339658197.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Paul Bunyan Products INC. — free Get an email when a new federal OSHA severe-injury report for Paul Bunyan Products INC. is published. One employer, no account, unsubscribe in one click.
Site address
7101 NYS ROUTE 281
City
PREBLE
State
NY
ZIP
13141
Mailing
P. O. BOX 190, PREBLE, NY 13141
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321920
Employees
24
Ownership type
A

5 citations on file for this inspection.

1910.22 A01

Other-than-serious 5 instances 5 exposed
Issued
Apr 15, 2014
Abate by
May 18, 2014
Penalty
Initial $1,700 · Current $1,020 Reduced
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition:    a)  Block Bin, on or about 4/2/14:  Stairway next to the block bin was filled with wood chips.    b)  Block Bin, on or about 4/2/14:  Wood dust had accumulated on rigid conduit, disconnects, around the bin and around the exhaust duct framework.    c)  Rework Area, on or about 4/2/14:  Wood dust and scrap wood pieces had accumulated around the Baker bandsaw and the Morgan trim saw.    d)  Main saw area, on or about 4/2/14:  Wood dust and scrap wood pieces had accumulated around the Brewer trim saw and Cornell cutoff saw.    e)  Hand Build/ West Wing, on or about 4/2/14:  Wood dust and scrap wood pieces had accumulated around the Baker pop up saw and the Kent block saw.    Abatement certification must be submitted for these items.
Recent events (2)
  • — I (O) $1020
  • — Z (S) $1700

1910.213 A09

Serious Gravity 5 1 instance 1 exposed
Issued
Apr 15, 2014
Abate by
Jun 2, 2014
Penalty
Initial $1,360 · Current $816 Reduced
29 CFR 1910.213(a)(9): All belts, pulleys, gears, shafts, and moving parts were not guarded in accordance with the specific requirements of 1910.219:  a)  Hand Build, West Wing, on or about 4/2/14:  Ingoing nip points on a conveyor belt and drive pulley for a Kent block saw were not guarded.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $816
  • — Z (S) $1360

1910.304 G05

Serious Gravity 1 1 instance 1 exposed
Issued
Apr 15, 2014
Abate by
Apr 25, 2014
Penalty
Initial $1,020 · Current $612 Reduced
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:  a)  Hand Build, West Wing, on or about 4/2/14: An extension cord providing current to a DeWalt cutoff saw was not grounded in that the ground pin was missing from the plug end.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (S) $612
  • — Z (S) $1020

1910.305 G01 IV A

Serious Gravity 1 4 instances 3 exposed
Issued
Apr 15, 2014
Abate by
May 18, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure:  a)  Pallet Area, on or about 4/2/14:  An orange extension cord providing current to a dust collection system was strung across the floor and being used as permanent wiring.  b)  Hand Build, West Wing, on or about 4/2/14:  An extension cord proving current to a DeWalt cutoff saw was being used as permanent wiring.  c)  Hand Build, West Wing, on or about 4/2/14:  Flexible cords providing current to two stackers were strung across the floor and being used as permanent wiring.  Abatement certification must be submitted for these items.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.305 C04

Other-than-serious 1 instance 1 exposed
Issued
Apr 15, 2014
Abate by
Apr 25, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.305(c)(4):  Switches mounted in boxes were not provided with faceplates installed to completely cover the opening:  a)  Rework area, on or about 4/2/14:  Cover was missing on the switch for the Band Ade band cutter.  Abatement certification must be submitted for this item.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Paul Bunyan Products INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339658197.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.