OSHA Inspection: PREMIER EXTERIORS, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of PREMIER EXTERIORS, LLC in BUILDING 626 MCAS, BEAUFORT, SC 29902 (NAICS 238140). OSHA activity number 339664278.

Watch Premier Exteriors, LLC — free Get an email when a new federal OSHA severe-injury report for Premier Exteriors, LLC is published. One employer, no account, unsubscribe in one click.
Site address
BUILDING 626 MCAS
City
BEAUFORT
State
SC
ZIP
29902
Mailing
3087 ARGENT BLVD., RIDGELAND, SC 29936
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
1
Ownership type
A

5 citations on file for this inspection.

1926.20 B02

Other-than-serious 1 instance 2 exposed
Issued
Abate by
Penalty
Initial $1760.00 · Current $0.00 Reduced
29 CFR 1926.20(b)(2): The employer did not initiate and maintain programs which provided for frequent and regular inspections of the job site, materials and equipment to be made by a competent person(s).    a) Workplace: On or about April 1, 2014 at Building 626 Marine Corps Air Station Beaufort, SC; Site inspections were not being performed on a frequent or regular basis by a competent person, ensuring safety and health hazards were identified and corrected in a timely manner.     NOTE: A "competent person" means one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them.      ABATEMENT CERTIFICATION IS REQUIRED
Recent events (2)
  • — I (O) $0
  • — Z (S) $1760

1926.451 C02 II

Serious Gravity 5 12 instances 2 exposed
Issued
Abate by
Penalty
Initial $2200.00 · Current $1540.00 Reduced
29 CFR 1926.451(c)(2)(ii): Unstable objects were used to support scaffolds or platform units:    a) Building 626: The tubular welded frame scaffold erected on all four sides of the building had at least 12 instances of scaffold legs on the west and south sides sitting atop unstable basing in the form of, stacks of scrap wooden boards placed atop voids.     ABATEMENT CERTIFICATION IS REQUIRED
Recent events (2)
  • — I (S) $1540
  • — Z (S) $2200

1926.452 C02

Deleted Serious Gravity 5 15 instances 2 exposed
Issued
Abate by
Penalty
Initial $2200.00 · Current $0.00 Reduced
29 CFR 1926.452(c)(2): All brace connections were not secured.  a) Worksite: Tubular welded frame scaffolds erected on all four sides of the building,  were found to have over 15 instances of scaffold bracing that was connected to the scaffold frame with small gauge wire, instead of internal pins and locking devices.   ABATEMENT CERTIFICATION IS REQUIRED.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2200

1926.454 C03

Deleted Serious Gravity 5 3 instances 2 exposed
Issued
Abate by
Penalty
Initial $2200.00 · Current $0.00 Reduced
29 CFR 1926.454(c)(3): The employer failed to retrain employees that showed indications through work performance of not retaining the requisite proficiency:  a) Worksite: The discovery of many instances of lack of properly securing bracing for a tubular welded frame scaffold erected at the site; indicates that retraining in scaffold competency is required.   b) Worksite:The discovery of many instances of unstable basing on the  tubular welded frame scaffold erected at the site; indicates that retraining in scaffold competency is required.   c) Worksite: With the "competent person"  signing off on the scaffold's inspection tag as being safe for use, indicates that retraining in scaffold competency is required.   ABATEMENT CERTIFICATION IS REQUIRED
Recent events (2)
  • — I (S) $0
  • — Z (S) $2200

1926.95 A

Serious Gravity 5 1 instance 1 exposed
Issued
Penalty
Initial $4400.00 · Current $1232.00 Reduced
29 CFR 1926.95(a): Protective equipment, including personal protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, were not provided, used, and maintained in a sanitary and reliable condition:    a) North side of the building: A sub-contractor employee sanding EPS insulation board which was attached to the wall of the building was not wearing safety glasses. The EPS insulation MSDS required the use of safety glasses while sanding on it.    b) North side of the building: A sub-contractor employee sanding EPS insulation board was wearing his respirator on his chin. The EPS insulation MSDS required the use of a respirator while sanding on it.    Premier Exteriors, LLC  was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1926.102(a)(1) which was contained in OSHA inspection number 736742, citation number 1, item number 1-a and was affirmed as a final order on 04-15-2013, with respect to a workplace located at Pooler, GA.
Recent events (2)
  • — I (S) $1232
  • — Z (R) $4400

View PREMIER EXTERIORS, LLC's full OSHA safety record →