MACON, GA ·
OSHA Inspection: STEEL SERVICES, INC.
Follow-up inspection · Safety discipline
At a glance
On , OSHA opened a follow-up safety inspection of STEEL SERVICES, INC. in 276 LOWER BOUNDARY ST., MACON, GA 31206 (NAICS 332999). OSHA activity number 339792988.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- STEEL SERVICES, INC.
- Site address
- 276 LOWER BOUNDARY ST.
- City
- MACON
- State
- GA
- ZIP
- 31206
- Mailing
- 276 LOWER BOUNDARY ST., MACON, GA 31206
What kind of inspection was it?
- Inspection type
- Follow-up (F)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (B)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- Employees
- 20
- Ownership type
- Private (A)
Citations
1 citation on file for this inspection.
1910.147 C04 II
- Issued
- Jul 11, 2014
- Abate by
- Aug 6, 2014
- Penalty
- Initial $3,080 · Current $1,848 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to items of this section: On or about May 30, 2014 at 276 Lower Boundary Road, Macon, GA: Employees were exposed to the release of hazardous energy when the employer's lockout and tag out procedures had deficiencies such as, but not limited to the following: a) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Do All Saw's arm. b) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Case Drill. c) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Hyd-Mech Saw. d) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 12' Shear. e) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 16' Shear. f) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 20' Shear. g) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Lown Roller. h) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Angle Roller. i) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 175 Press Brake . j) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 400 Press Brake. k) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 500 Press Brake. l) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 1000 Press Brake. m) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Ficep. n) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 3700. o) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the HanKwang Laser. p) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Messer. q) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Webb Roller. r) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the Panel Master. s) Procedures did not specify the location of the energy isolation devices, the magnitude of energy, or the specific procedural steps to isolate the 1250 Press Brake
Recent events (2)
- · I (S) $1848
- · Z (S) $3080
More inspections at Steel Services, INC.
View Steel Services, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in GA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 339792988.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.