Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NATIONAL ROOFING

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of NATIONAL ROOFING in 808 MASSACHUSETTS AVENUE, NE, WASHINGTON, DC 20002 (NAICS 238160). OSHA activity number 339851537.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch National Roofing — free Get an email when a new federal OSHA severe-injury report for National Roofing is published. One employer, no account, unsubscribe in one click.
Establishment
NATIONAL ROOFING
Site address
808 MASSACHUSETTS AVENUE, NE
City
WASHINGTON
State
DC
ZIP
20002
Mailing
1629 K STREET, NW, WASHINGTON, DC 20036
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
5
Ownership type
A

7 citations on file for this inspection.

1926.21 B02

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 13, 2014
Abate by
Aug 25, 2014
Penalty
Initial $1,600 · Current $0 Reduced
29 CFR 1926.21(b)(2): The employer did not instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his/her environment to control or eliminate any hazards or other exposure to illness or injury:   a) Job Site - Employees were not provided with adequate training in hazard recognition as evidenced by an employee applying Karnak roofing cement without wearing eye protection, and an employee using a propane torch to heat roof flashing and fire extinguishing equipment was not available, on or about 04/01/2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $1600

1926.102 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Aug 13, 2014
Abate by
Aug 19, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents:   a) Rear Roof - An employee was observed applying Karnak Roofing Cement with a trowel and not wearing eye protection, on or about 04/01/2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.352 D

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 13, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.352(d): Suitable fire extinguishing equipment was not immediately available in the work area(s) where welding, cutting, or heating was being performed:   a) Rear Roof Parapet - An employee was observed heating a piece of flashing with a propane torch and a portable fire extinguisher was not on the roof, on or about 04/01/2014.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.503 A01

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 13, 2014
Abate by
Sep 2, 2014
Penalty
Initial $2,000 · Current $0 Reduced
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee potentially exposed to fall hazards to enable each employee to recognize the hazards of falling and the procedures to be followed in order to minimize these hazards:   a) Job Site - Employees were not provided adequate training in recognizing fall hazards in association with working on flat roofs as evidenced by observing employees engaged in roofing operations on a flat roof without fall protection, exposed to a fall hazard of 35 feet, on or about 04/01/2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2000

1926.1060 A

Serious Gravity 5 1 instance 5 exposed
Issued
Aug 13, 2014
Abate by
Aug 25, 2014
Penalty
Initial $2,000 · Current $0 Reduced
29 CFR 1926.1060(a): The employer did not provide a training program for each employee using ladders and stairways, as necessary, which would enable each employee to recognize hazards related to ladders and stairways and train each employee in the procedures to be followed to minimize these hazards:   a) Job Site - Employees were not provided adequate training in recognizing hazards associated with ladder usage as evidenced by the ladder side rails were approximately one foot short of the roof landing and there was no grab rail provided at the top of the roof landing. Also, the top of the ladder was one foot from the face of the roof landing, on or about 04/01/2014.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $2000

1926.501 B13

Serious Gravity 10 1 instance 5 exposed
Issued
Aug 13, 2014
Abate by
Aug 19, 2014
Penalty
Initial $5,600 · Current $0 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):     a) Roof Level - Employees were observed on a flat roof that was 20 feet wide while performing roofing work operations and not protected from a 35' fall hazard, on or about 04/01/2014.      National Roofing was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.501(b)(13), which was contained in OSHA inspection number 753041, citation number 1, item number 1, and was affirmed as a final order on 03/13/2013, with respect to a workplace located at 5050 MacArthur Blvd, NW, Washington DC 20036.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (R) $5600

1926.1053 B01

Serious Gravity 10 1 instance 5 exposed
Issued
Aug 13, 2014
Abate by
Aug 19, 2014
Penalty
Initial $5,600 · Current $0 Reduced
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:     a) Exterior Front of Building - Employees were observed using a 48 feet portable extension ladder to gain access to the roof level 35 feet above the ground and the top of the ladder was one foot short of the landing surface, on or about 04/01/2014.     National Roofing was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29 CFR 1926.1053(b)(1), which was contained in OSHA inspection number 753041, citation number 1, item number 2, and was affirmed as a final order on 03/18/2013, with respect to a workplace located at 5050 MacArthur Blvd, NW Washington DC.     Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (R) $5600

View National Roofing's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339851537.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.