Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MACLEAN POWER SYSTEMS, LIMITED PARTNERSHIP

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of MACLEAN POWER SYSTEMS, LIMITED PARTNERSHIP in 3098 PELHAM PARKWAY, PELHAM, AL 35124 (NAICS 335999). OSHA activity number 339855165.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Maclean Power Systems, Limited Partnership — free Get an email when a new federal OSHA severe-injury report for Maclean Power Systems, Limited Partnership is published. One employer, no account, unsubscribe in one click.
Site address
3098 PELHAM PARKWAY
City
PELHAM
State
AL
ZIP
35124
Mailing
3098 PELHAM PARKWAY, PELHAM, AL 35124
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
335999
Employees
189
Ownership type
A

6 citations on file for this inspection.

1910.147 C04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2014
Abate by
Oct 1, 2014
Penalty
Initial $7,000 · Current $4,200 Reduced
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section:  a) On or about 07/17/2014 - HLS Assembly, employees conducting cleaning on a Minister Model#77237 part revolution power press did not utilize lockout and tagout procedures to fully deenergize the equipment.
Recent events (2)
  • — I (S) $4200
  • — Z (S) $7000

1910.147 C07 I

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 19, 2014
Abate by
Oct 1, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees:   a) on or about 07/17/2014 - HLS assembly, employees performing maintenance, greasing, and die changes on the Minister Model#77237 part revolution power press were unaware of the hazards.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.212 A01

Serious Gravity 5 9 instances 4 exposed
Issued
Sep 19, 2014
Abate by
Oct 1, 2014
Penalty
Initial $6,000 · Current $3,600 Reduced
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks:  a) On or about 07/17/2014 - Pattern shop, a Powermatic drill press Model#1150, S/N#3-S2075 was being operated with unguarded rotating parts.  b) On or about 07/17/2014 - Pattern shop, a Powermatic drill press Model#1200, S/N#420V438 was being operated with unguarded rotating parts.   c) On or about 07/17/2014 - Pattern shop, a Powermatic drill press Model#600, S/N#499495 was being operated with unguarded rotating parts.   d) On or about 07/17/2014 - Pattern shop, a Powermatic band saw Model#8J, S/N#481166 was being operated with the unused portion of the blade exposed.   e) On or about 07/17/2014 - Pattern shop, a Davis & Wells band saw #19, S/N#40019 was being operated with the unused portion of the blade exposed.   f) On or about 07/17/2014 - Pattern shop, a South band horizontal lathe was being operated with unguarded rotating parts.   g) On or about 07/17/2014 - Pattern shop, a Supermax (Bridgeport) vertical milling machine was being operated with unguarded rotating parts.  h) On or about 07/17/2014 - Assembly department, a drill press was being operated with unguarded rotating parts.   i) On or about 07/17/2014 - Inspection department, a Burr king sanding machine was being operated with inrunning nip points exposed.
Recent events (2)
  • — I (S) $3600
  • — Z (S) $6000

1910.217 E01 I

Serious Gravity 5 1 instance 2 exposed
Issued
Sep 19, 2014
Abate by
Oct 1, 2014
Penalty
Initial $6,000 · Current $3,600 Reduced
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power press(es) was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment:  a) On or about 07/17/2014 - HLS assembly area, employees operate the 45 ton Minister Model#77257 without a designed preventive maintenance program.
Recent events (2)
  • — I (S) $3600
  • — Z (S) $6000

1910.303 G02 I

Serious Gravity 10 1 instance 1 exposed
Issued
Sep 19, 2014
Abate by
Oct 1, 2014
Penalty
Initial $7,000 · Current $4,200 Reduced
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating  at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i):  a) On or about 07/17/2014 - Pattern shop, electrical circuit breakers rated at 240 volts were not effectively closed.
Recent events (2)
  • — I (S) $4200
  • — Z (S) $7000

1910.147 C06 I

Other-than-serious 1 instance 2 exposed
Issued
Sep 19, 2014
Abate by
Oct 16, 2014
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed:  a) On or about 07/17/2014 - Throughout the facility, machinery such as, but not limited to, a 45 ton Minister Model# 77237 part revolution power press, a 22 ton trim press, S/N#57-1139 part revolution power press, and a Mazak CNC machine had not received an annual review.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View Maclean Power Systems, Limited Partnership's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339855165.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.