OSHA Inspection: UHL CONSTRUCTION COMPANY, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of UHL CONSTRUCTION COMPANY, INC. in BECHT HALL - CLARION UNIVERSITY 840 WOOD ST., CLARION, PA 16214 (NAICS 236220). OSHA activity number 339877839.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch UHL Construction Company, INC. — free Get an email when a new federal OSHA severe-injury report for UHL Construction Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
BECHT HALL - CLARION UNIVERSITY 840 WOOD ST.
City
CLARION
State
PA
ZIP
16214
Mailing
P.O. BOX 8, ALLISON PARK, PA 15101
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
Employees
29
Ownership type
A

3 citations on file for this inspection.

1926.405 A02 II I

Other-than-serious 1 instance 2 exposed
Issued
Nov 17, 2014
Abate by
Dec 12, 2014
Penalty
Initial $1,785 · Current $1,000 Reduced
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables were not protected from damage.  Sharp corners and projections were not avoided:     a) construction site, Clarion University - Becht Hall, in Clarion, PA.  On or about July 31, 2014, extension cords, used to power the table saws and other electrical tools, were damaged in that the outer sheathing was sliced open, exposing the inner wires of the cords.  The extension cords were not protected from the sharp edges of the metal stud framing. In addition, the extension cords were not routed in a manner to avoid the edges of the metal stud framing.
Recent events (2)
  • — I (O) $1000
  • — Z (S) $1785

1926.416 E01

Other-than-serious 1 instance 2 exposed
Issued
Nov 17, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used:    a) construction site, Clarion University - Becht Hall, in Clarion, PA.  On or about July 31, 2014, extension cords, used to power the table saws and other electrical tools, were damaged in that, the outer sheathing was sliced open, exposing the inner wires of the cords.
Recent events (2)
  • — I (O) $0
  • — Z (S) $0

1926.150 A04

Other-than-serious 1 instance 29 exposed
Issued
Nov 17, 2014
Penalty
Initial $0 · Current $0
29 CFR 1926.150(a)(4): All firefighting equipment was not maintained in operating condition and defective equipment was not immediately replaced:    a) construction site, Clarion University - Becht Hall, in Clarion, PA.  On or about July 31, 2014, the defective portable fire extinguishers in the first floor stairwell was not maintained in operating condition in that the extinguisher needed to be recharged.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View UHL Construction Company, INC.'s full OSHA safety record →