Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: VEOLIA ES TECHNICAL SOLUTIONS, L.L.C.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of VEOLIA ES TECHNICAL SOLUTIONS, L.L.C. in 125 FACTORY LANE, MIDDLESEX, NJ 08846 (NAICS 562920). OSHA activity number 339933863.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Veolia ES Technical Solutions, L.L.C. — free Get an email when a new federal OSHA severe-injury report for Veolia ES Technical Solutions, L.L.C. is published. One employer, no account, unsubscribe in one click.
Site address
125 FACTORY LANE
City
MIDDLESEX
State
NJ
ZIP
08846
Mailing
125 FACTORY LANE, MIDDLESEX, NJ 08846
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
562920
Employees
55
Ownership type
A

4 citations on file for this inspection.

1910.119 J02

Other-than-serious 2 instances 29 exposed
Issued
Mar 2, 2015
Abate by
Apr 16, 2015
Penalty
Initial $3,400 · Current $3,400
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment:    a) 125 Factory Ln, Middlesex, NJ site -  Process area:       Employer failed to establish written procedures  for inspecting and testing pressure relief devices such as but not limited to pressure relief valves and conservation vents located on the Still #5 - fractional distillation column and the molecular sieve.    Condition noted on or about 02/05/15.
Recent events (3)
  • — R (O) $3400
  • — C (S) $3400
  • — Z (S) $3400

1910.119 J04 III

Other-than-serious 1 instance 29 exposed
Issued
Mar 2, 2015
Abate by
Apr 16, 2015
Penalty
Initial $3,400 · Current $0 Reduced
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience:    a) 125 Factory Ln, Middlesex, NJ site -  Process area:       Employer failed to establish a definite time interval between inspections or tests for pressure relief valves at the worksite based on operating experiences, good engineering practices and manufacturers' recommendations.    Condition noted on or about 02/05/15.     RAGAGEP such as but not limited to API 510 which gives guidance as to establishing and implementing defined inspection intervals was not followed:    6.6.2 Testing and Inspection Intervals  6.6.2.2 Unless documented experience and/or a RBI assessment indicates that a longer interval is acceptable, test and inspection intervals for pressure-relieving devices in typical process services should not exceed:  a. Five years for typical process services; and,  b. Ten years for clean (non-fouling) and noncorrosive services.
Recent events (3)
  • — R (O) $0
  • — C (S) $3400
  • — Z (S) $3400

1910.119 J04 IV

Other-than-serious 8 instances 29 exposed
Issued
Mar 2, 2015
Abate by
Apr 16, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that was performed on process equipment wherein the documentation identified the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed, and the results of the inspection or test:    a) 125 Factory Ln, Middlesex, NJ site -  Process area:       Employer failed to document each inspection and test that was performed  on the (8) pressure relief valves located on the Still #5 - fractional distillation column and molecular sieve.     Condition noted on or about 02/05/15.
Recent events (3)
  • — R (O) $0
  • — C (S) $0
  • — Z (S) $0

1910.219 C02

Serious Gravity 5 2 instances 29 exposed
Issued
Mar 2, 2015
Penalty
Initial $3,400 · Current $2,100 Reduced
29 CFR 1910.219(c)(2): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, were not protected by a stationary casing enclosing shafting completely:    125 Factory Ln, Middlesex, NJ site -  Process area: Employer did not provide stationary casing on horizontal shafts.    a) Still #2 - Moving parts of the horizontal shafting of the motors which control the agitators inside of Stills #1 not adequately guarded.    b) Still #1 - Rotating horizontal shaft on the ground level motor was not adequately guarded as the metal guard was damaged.    Condition noted on or about 09/04/2014.
Recent events (3)
  • — R (S) $2100
  • — C (S) $3400
  • — Z (S) $3400

View Veolia ES Technical Solutions, L.L.C.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339933863.