MIDDLESEX, NJ —
OSHA Inspection: VEOLIA ES TECHNICAL SOLUTIONS, L.L.C.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of VEOLIA ES TECHNICAL SOLUTIONS, L.L.C. in 125 FACTORY LANE, MIDDLESEX, NJ 08846 (NAICS 562920). OSHA activity number 339933863.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- VEOLIA ES TECHNICAL SOLUTIONS, L.L.C.
- Site address
- 125 FACTORY LANE
- City
- MIDDLESEX
- State
- NJ
- ZIP
- 08846
- Mailing
- 125 FACTORY LANE, MIDDLESEX, NJ 08846
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 562920
- Employees
- 55
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.119 J02
- Issued
- Mar 2, 2015
- Abate by
- Apr 16, 2015
- Penalty
- Initial $3,400 · Current $3,400
General-duty citation text
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment: a) 125 Factory Ln, Middlesex, NJ site - Process area: Employer failed to establish written procedures for inspecting and testing pressure relief devices such as but not limited to pressure relief valves and conservation vents located on the Still #5 - fractional distillation column and the molecular sieve. Condition noted on or about 02/05/15.
Recent events (3)
- — R (O) $3400
- — C (S) $3400
- — Z (S) $3400
1910.119 J04 III
- Issued
- Mar 2, 2015
- Abate by
- Apr 16, 2015
- Penalty
- Initial $3,400 · Current $0 Reduced
General-duty citation text
29 CFR 1910.119(j)(4)(iii): The frequency of inspections and tests of process equipment was not consistent with applicable manufacturers' recommendations and good engineering practices, and more frequently if determined to be necessary by prior operating experience: a) 125 Factory Ln, Middlesex, NJ site - Process area: Employer failed to establish a definite time interval between inspections or tests for pressure relief valves at the worksite based on operating experiences, good engineering practices and manufacturers' recommendations. Condition noted on or about 02/05/15. RAGAGEP such as but not limited to API 510 which gives guidance as to establishing and implementing defined inspection intervals was not followed: 6.6.2 Testing and Inspection Intervals 6.6.2.2 Unless documented experience and/or a RBI assessment indicates that a longer interval is acceptable, test and inspection intervals for pressure-relieving devices in typical process services should not exceed: a. Five years for typical process services; and, b. Ten years for clean (non-fouling) and noncorrosive services.
Recent events (3)
- — R (O) $0
- — C (S) $3400
- — Z (S) $3400
1910.119 J04 IV
- Issued
- Mar 2, 2015
- Abate by
- Apr 16, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.119(j)(4)(iv): The employer did not document each inspection and test that was performed on process equipment wherein the documentation identified the date of the inspection or test, the name of the person who performed the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test performed, and the results of the inspection or test: a) 125 Factory Ln, Middlesex, NJ site - Process area: Employer failed to document each inspection and test that was performed on the (8) pressure relief valves located on the Still #5 - fractional distillation column and molecular sieve. Condition noted on or about 02/05/15.
Recent events (3)
- — R (O) $0
- — C (S) $0
- — Z (S) $0
1910.219 C02
- Issued
- Mar 2, 2015
- Penalty
- Initial $3,400 · Current $2,100 Reduced
General-duty citation text
29 CFR 1910.219(c)(2): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, were not protected by a stationary casing enclosing shafting completely: 125 Factory Ln, Middlesex, NJ site - Process area: Employer did not provide stationary casing on horizontal shafts. a) Still #2 - Moving parts of the horizontal shafting of the motors which control the agitators inside of Stills #1 not adequately guarded. b) Still #1 - Rotating horizontal shaft on the ground level motor was not adequately guarded as the metal guard was damaged. Condition noted on or about 09/04/2014.
Recent events (3)
- — R (S) $2100
- — C (S) $3400
- — Z (S) $3400
More inspections at Veolia ES Technical Solutions, L.L.C.
View Veolia ES Technical Solutions, L.L.C.'s full OSHA safety record →
More inspections in this industry (NAICS 562920)
More inspections in NJ
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 339933863.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.