WOODWAY, TX —
OSHA Inspection: ALL PHASE CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ALL PHASE CONSTRUCTION in 2212 NICOLAS, WOODWAY, TX 76712 (NAICS 238130). OSHA activity number 340110931.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ALL PHASE CONSTRUCTION
- Site address
- 2212 NICOLAS
- City
- WOODWAY
- State
- TX
- ZIP
- 76712
- Mailing
- 207 OTIS DR SUITE 7, WOODWAY, TX 76712
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238130
- Employees
- 15
- Ownership type
- A
Citations
4 citations on file for this inspection.
1926.102 A01
- Issued
- Jan 30, 2015
- Penalty
- Initial $1,020 · Current $1,020
General-duty citation text
29 CFR 1926.102(a)(1): Eye and face protective equipment were not used when machines or operations presented potential eye or face injury from physical, chemical, or radiation agents. On or about November 19, 2014, at least one employee operating a table brick saw to cut material was not wearing eye protection exposing him to being struck by the flying material and eye injuries.
Recent events (1)
- — Z (S) $1020
1926.501 B13
- Issued
- Jan 30, 2015
- Abate by
- Mar 2, 2015
- Penalty
- Initial $2,800 · Current $2,800
General-duty citation text
29 CFR 1926.501(b)(13): Each employee engaged in residential construction activities 6 feet (1.8 m) or more above lower levels was not protected by guardrail systems, safety net system, or personal fall arrest system. On or about November 19, 2014, employees performing framing activities on a residential framed structure were exposed to an unprotected fall hazard at a height of over 6 feet to the ground below.
Recent events (1)
- — Z (S) $2800
1926.503 A01
- Issued
- Jan 30, 2015
- Abate by
- Mar 2, 2015
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.503(a)(1): The employer did not provide a training program for each employee who might be exposed to fall hazards. On or about November 19, 2014, the employer did not ensure employees engaged in framing activities were trained to recognize and avoid fall hazards and the procedures to be followed in order to minimize or avoid those hazards.
Recent events (1)
- — Z (S) $1200
1926.1051 A
- Issued
- Jan 30, 2015
- Abate by
- Mar 2, 2015
- Penalty
- Initial $1,200 · Current $1,200
General-duty citation text
29 CFR 1926.1051(a): Stairway(s) or ladder(s) were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, or no ramp, runway, sloped embankment, or personnel hoist was provided: On or about November 19, 2014, employees performing framing activities on a new residential home were not provided a ladder to safely gain access to the upper areas exposing the employees to an unprotected fall of up to 11 feet to the concrete below.
Recent events (1)
- — Z (S) $1200
More inspections at ALL Phase Construction
View ALL Phase Construction's full OSHA safety record →
More inspections in this industry (NAICS 238130)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340110931.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.