OSHA Inspection: CALISEUM II INC.

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of CALISEUM II INC. in 2647 W. MEDILL AVE., CHICAGO, IL 60647 (NAICS 238140). OSHA activity number 340159854.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Caliseum II INC. — free Get an email when a new federal OSHA severe-injury report for Caliseum II INC. is published. One employer, no account, unsubscribe in one click.
Establishment
CALISEUM II INC.
Site address
2647 W. MEDILL AVE.
City
CHICAGO
State
IL
ZIP
60647
Mailing
3104 W. WALTON ST. APT 2, CHICAGO, IL 60622
Inspection type
Federal Agency (M)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
4
Ownership type
A

9 citations on file for this inspection.

1903.19 C01

Other-than-serious 1 instance 1 exposed
Issued
Aug 26, 2015
Abate by
Sep 29, 2015
Penalty
Initial $400 · Current $400
29 CFR 1903.19(c)(1):  The employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated:     Caliseum II, Inc., failed to certify to OSHA within 10 calendar days after the abatement date that each of the following cited violations had been corrected:     Citation Number                       Item Number                            Abatement Date  01                                            02                                            07/08/2015  01                                            03                                            07/08/2015  01                                            04a                                           07/08/2015  01                                            04b                                           07/08/2015 01                                            04c                                           07/08/2015     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (1)
  • — Z (O) $400

1926.451 B01

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1):  Each platform on all working levels was not fully planked or decked between front uprights and the guardrail supports:      a) On or about December 30, 2014, employees working from tubular welded frame scaffolding were exposed to fall hazards of approximately 25 feet where the scaffold platform was not fully planked.
Recent events (1)
  • — Z (S) $2800

1926.451 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(2): Scaffold platforms and walkways were not at least 18 inches wide:  a) On or about December 30, 2014, employees were working from a single wood 2x10 scaffold plank.
Recent events (1)
  • — Z (S) $0

1926.451 C01

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Abate by
Jul 8, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(c)(1):  Supported scaffold(s) with a height to base width (including outrigger supports) ratio greater than four to one (4:1) was not restrained from tipping by guying, tying, bracing, or equivalent means:    a)  On or about December 30, 2014, employees were exposed to fall hazards of greater than 25 feet while working on a tubular welded frame scaffold which was not restrained from tipping by any means.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.451 E01

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Abate by
Jul 8, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(e)(1):  Portable ladder, hook-on ladder, attachable ladder, stair tower, stairway-type ladder, ramp, runway, integral prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist, or similar surface was not used to access scaffold platforms more than 2 feet above or below a point of access:     a) On or about December 30, 2014, employees were exposed to a fall hazard of greater than 25 feet while accessing the work platform of a tubular welded frame scaffold.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.451 F07

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Abate by
Jul 8, 2015
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(f)(7): Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration.  Such activities shall be performed only by experienced and trained employees selected for such work by the competent person:    a)  Employees required to erect a supported scaffold performed such activities without training or the direction of a competent person.    In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $2800

1926.454 A

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Abate by
Jul 8, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.454(a):  The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:    a)  Employees were not trained to recognize and eliminate the hazards associated with working from scaffolding.  In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.454 B

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Abate by
Jul 8, 2015
Penalty
Initial $0 · Current $0
29 CFR 1926.454(b): The employer did not have each employee involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work in question:  a)  Employees involved in erecting and inspecting scaffolding were not trained to recognize hazards associated with erecting and inspecting a scaffolding.   In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G01

Serious Gravity 10 1 instance 4 exposed
Issued
Jun 25, 2015
Penalty
Initial $7,000 · Current $7,000
29 CFR 1926.451(g)(1):  Each employee on a scaffold more than 10 feet above a lower level was not protected from falling to that lower level:    a) On or about December 30, 2014, employees working from tubular welded frame scaffolding were exposed to fall hazards of greater than 25 feet.    No abatement certification or documentation is required for this item.
Recent events (1)
  • — Z (S) $7000

View Caliseum II INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340159854.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.