OSHA Inspection: GILMAN BUILDING PRODUCTS, LLC

Federal Agency inspection · Safety discipline

On , OSHA opened a federal Agency safety inspection of GILMAN BUILDING PRODUCTS, LLC in 3780 US HIGHWAY 80 W, DUDLEY, GA 31022 (NAICS 321113). OSHA activity number 340206119.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gilman Building Products, LLC — free Get an email when a new federal OSHA severe-injury report for Gilman Building Products, LLC is published. One employer, no account, unsubscribe in one click.
Site address
3780 US HIGHWAY 80 W
City
DUDLEY
State
GA
ZIP
31022
Mailing
3780 US HIGHWAY 80 W, DUDLEY, GA 31022
Inspection type
Federal Agency (M)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
A
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
321113
Employees
800
Ownership type
A

12 citations on file for this inspection.

1910.110 D10

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 13, 2015
Penalty
Initial $4,675 · Current $3,300 Reduced
29 CFR 1910.110(d)(10): Precautions were not taken to prevent damage to LP gas system(s) from vehicular traffic    (a) Yard Storage Area, on or about and at times preceding to February 4, 2015, 500 gallon liquid petroleum tank was not protected against the vehicular traffic.
Recent events (2)
  • — Z (S) $4675
  • — I (S) $3300

1910.132 A

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $4,400 · Current $2,958 Reduced
29 CFR 1910.132(a): Protective equipment was not used when necessary whenever hazards capable of causing injury and impairment were encountered:     (a) In the Maintenance Area, on or about February 4, 2015, a protective impermeable apron was not provided when diluting CIA Degreaser concentrate with water into the spray application container.
Recent events (2)
  • — Z (S) $4400
  • — I (S) $2958

1910.133 A01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.133(a)(1): Protective face equipment was not required where there was a reasonable probability of injury that could be prevented by such equipment:  (a) In the Maintenance Area, on or about February 4, 2015, a protective face shield was not provided when diluting CIA Degreaser concentrate with water into spray application container.
Recent events (2)
  • — Z (S) $0
  • — I (S) $0

1910.147 C04 II

Serious Gravity 10 1 instance 6 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $7,000 · Current $7,000
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items of this section.    (a) Planner Mill, Itipack Systems, SKP-25-1 Automated Heavy-Duty Strapping System, on or about and at times preceding to January 23, 2015, the company's energy control procedures did not specifically outline the rules and techniques to be utilized to obtain a zero energy state when making adjustments to the plastic strap feeding mechanism that bands the lumber bundles for shipment.
Recent events (2)
  • — Z (S) $7000
  • — I (S) $7000

1910.151 C

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $4,400 · Current $2,958 Reduced
29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:    (a) In the maintenance area, on or about February 4, 2015, the emergency eyewash station was blocked and nonfunctional, therefore was not available for use with/for application of CIA Degreaser for spraying plant surfaces when diluting concentrate.
Recent events (2)
  • — Z (S) $4400
  • — I (S) $2958

1910.243 C01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $5,500 · Current $2,958 Reduced
29 CFR 1910.243(c)(1): Abrasive wheel(s) were used on portable grinder(s) which were not provided with safety guard(s) meeting the requirements specified in 29 CFR 1910.243(c)(1) through (c)(4)(a):    (a) Saw Shop, on or about and at times preceding to February 4, 2015, Redipower serial number #D02414-2011 7-inch diameter pneumatic grinder was not equipped with a guard.
Recent events (2)
  • — Z (S) $5500
  • — I (S) $2958

1910.253 B04 III

Serious Gravity 5 1 instance 2 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $4,400 · Current $2,958 Reduced
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least.    (a) Exterior cylinder storage area, on or about and at times preceding to January 27, 2015, fuel gas cylinders and oxygen cylinders were stored together.
Recent events (2)
  • — Z (S) $4400
  • — I (S) $2958

1910.265 C04 VI

Serious Gravity 5 1 instance 3 exposed
Issued
Jul 13, 2015
Penalty
Initial $4,675 · Current $3,300 Reduced
29 CFR 1910.265(c)(4)(vi): Walkway(s) and stairway(s), with standard handrails, were not provided where required in elevated and hazardous locations:    (a) Sawmill, Sorting Log Deck, on or about and at times preceding to February 4, 2015, 60 foot walkway adjacent to Northside of new sorting deck was not equipped with standard railing system, exposing employees to moving log chain conveyors.
Recent events (2)
  • — Z (S) $4675
  • — I (S) $3300

1910.265 C18 I

Serious Gravity 5 1 instance 10 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $4,400 · Current $2,958 Reduced
29 CFR 1910.265(c)(18)(i): Conveyor(s) installed within 7 feet of the floor or walkway surface were not provided with crossover(s) or passageway(s) or with telltales indicating low headroom:    (a) Sawmill,  New Log Deck, on or about February 4, 2015, chain driven conveyor regularly crossed, required employees to crossover a 48 inch wide conveyor, without an established crossover method.
Recent events (2)
  • — Z (S) $4400
  • — I (S) $2958

1910.303 B07 IV

Serious Gravity 5 1 instance 6 exposed
Issued
Jul 13, 2015
Penalty
Initial $5,610 · Current $5,610
29 CFR 1910.303(b)(7)(iv): There were damaged parts that may adversely affect safe operation or mechanical strength of electric equipment, such as parts that were broken, bent, cut or deteriorated by corrosion, chemical action, or overheating:  (a) Planner Mill, on or about and at times preceding to, January 24, 2015, the emergency stop cable on the Itipack Banding machine was disconnected and was not operational.
Recent events (2)
  • — Z (S) $5610
  • — I (S) $5610

1910.305 G02 III

Other-than-serious 1 instance 5 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $3,300 · Current $0 Reduced
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws:     (a) Maintenance Shop, on or about and at times preceding to February 4, 2015, duplex 110 V outlet had strain relief at the terminal end connection, exposing employees to electrical shock hazards.
Recent events (2)
  • — Z (S) $3300
  • — I (O) $0

1910.305 G01 IV B

Other-than-serious 1 instance 10 exposed
Issued
Jul 13, 2015
Abate by
Aug 6, 2015
Penalty
Initial $0 · Current $0
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors:  (a) Maintenance Shop, on or about and at times preceding to February 4, flexible cord was run through metal wall to be plugged in to outlet on opposite side of wall.
Recent events (2)
  • — Z (O) $0
  • — I (O) $0

View Gilman Building Products, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340206119.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.