HIALEAH GARDENS, FL —
OSHA Inspection: ROYAL PLASTERING, CORP.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ROYAL PLASTERING, CORP. in 12010 HIALEAH GARDENS BLVD., HIALEAH GARDENS, FL 33018 (NAICS 238310). OSHA activity number 340305135.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ROYAL PLASTERING, CORP.
- Site address
- 12010 HIALEAH GARDENS BLVD.
- City
- HIALEAH GARDENS
- State
- FL
- ZIP
- 33018
- Mailing
- 16991 SW 156 COURT, MIAMI, FL 33187
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238310
- Employees
- 5
- Ownership type
- A
Citations
9 citations on file for this inspection.
1926.451 B01
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about 2/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold not fully planked at a height of approximately 18 feet above ground level, exposing the employees to a fall hazard. NOTE: CERTIFICATION OF ABATEMENT MUST BE SUBMITTED FOR THIS ITEM.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1926.451 C02
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights did not bear on base plates and mud sills or other adequate firm foundation: On or about 2/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold at 18 feet above ground level with base plates and mudsills missing from the scaffold. NOTE: CERTIFICATION OF ABATEMENT MUST BE SUBMITTED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 E09 IV
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress: On or about 2/06/2015, at the above addressed jobsite, employees were climbing a scaffold to perform plastering work using the scaffold side frames bracings. NOTE: CERTIFICATION OF ABATEMENT MUST BE PROVIDED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 F04
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(f)(4): Part(s) of a scaffold that were damaged or weakened, such that the scaffold's strength was less than that required by paragraph (a) of this section, were not immediately repaired, replaced, braced to meet those provisions, nor removed from service until repaired: On or about 02/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold with vertical members that were visibly damage exposing him to a fall hazard. NOTE: CERTIFICATION OF ABATEMENT MUST BE SUBMITTED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 F07
- Issued
- Apr 21, 2015
- Abate by
- Jun 7, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person: On or about 2/06/2015, at the above addressed jobsite, a scaffold was erected without the supervision of a competent person. NOTE: CERTIFICATION OF ABATEMENT MUST BE PROVIDED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.451 G04 I
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $3,500 · Current $2,100 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms: On or about 2/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold at approximately 18 feet above ground level with missing guardrails, exposing employees to a fall hazard. NOTE: CERTIFICATION OF ABATEMENT MUST BE SUBMITTED FOR THIS ITEM.
Recent events (2)
- — I (S) $2100
- — Z (S) $3500
1926.451 H02 II
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: On or about 2/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold without toe board at a height of approximately 18 feet above ground level, exposing the employees to a struck-by hazard. NOTE: CERTIFICATION OF ABATEMENT MUST BE PROVIDED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.452 C02
- Issued
- Apr 21, 2015
- Abate by
- May 1, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal or diagonal braces, or combination thereof, which secure vertical members together laterally: On or about 2/06/2015, at the above addressed jobsite, employees were engaged in plastering work from a scaffold with missing cross braces, to secure vertical members together laterally exposing employees to fall hazard. NOTE: CERTIFICATION OF ABATEMENT MUST BE PROVIDED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
1926.454 A
- Issued
- Apr 21, 2015
- Abate by
- Jun 7, 2015
- Penalty
- Initial $1,600 · Current $960 Reduced
General-duty citation text
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards: On or about 2/06/2015 at the above addressed jobsite, the employer did not provide training to employees in the recognition of fall hazards when working from a scaffold. NOTE: CERTIFICATION OF ABATEMENT MUST BE PROVIDED FOR THIS ITEM.
Recent events (2)
- — I (S) $960
- — Z (S) $1600
More inspections at Royal Plastering, Corp.
View Royal Plastering, Corp.'s full OSHA safety record →
More inspections in this industry (NAICS 238310)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340305135.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.