On , OSHA opened a planned safety inspection of PRETIUM PACKAGING LLC in 200 W. 20TH STREET, HERMANN, MO 65041 (NAICS 326160). OSHA activity number 340443860.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PRETIUM PACKAGING LLC
- Site address
- 200 W. 20TH STREET
- City
- HERMANN
- State
- MO
- ZIP
- 65041
- Mailing
- P.O. BOX 230, HERMANN, MO 65041
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326160
- Employees
- 100
- Ownership type
- A
Citations
7 citations on file for this inspection.
1910.23 E01
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $5,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.23(e)(1): A standard railing did not consist of top rail, intermediate rail, and posts: a/ Inside of the Production area, the stair railings belonging to three flights of stairs were not equipped with an intermediate rail. One flight of stairs led to an elevated platform adjacent to the Bekum Extrusion Blow Molder Machine #53. A second flight of stairs led to an elevated platform adjacent to the Silo Inlet. The third flight of stairs led to an elevated platform adjacent to the Bekum Extrusion Blow Molder Machine #52. The fall distance from the top of each flight of stairs to the concrete floor below was approximately 98 inches.
Recent events (2)
- — I (S) $0
- — Z (S) $5000
1910.24 E
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.24(e): Fixed stairs were installed at an angle to the horizontal greater than 50 degrees: a/ Inside of the Production area, the slope of three flights of stairs exceeded 50 degrees from the horizontal. One flight of stairs that led to an elevated platform adjacent to the Bekum Extrusion Blow Molder Machine #53 was approximately 70 degrees. A second flight of stairs that led to an elevated platform adjacent to the Silo Inlet was approximately 65 degrees. The third flight of stairs that led to an elevated platform adjacent to the Bekum Extrusion Blow Molder Machine #52 was approximately 70 degrees. The fall distance from the top of each flight of stairs to the concrete floor below was approximately 98 inches.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C04 I
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $5,000 · Current $5,000
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a/ Inside of the Shipping Department, written, specific procedures were not developed or utilized for the orderly isolation of all three energy sources belonging to the Selco Vertical Baler, m/n 60E, s/n F10841736. This baler functions off of 220 volts, hydraulics, and gravity.
Recent events (2)
- — I (S) $5000
- — Z (S) $5000
1910.147 C04 II
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, including, but not limited to Items A-D of this section: Inside of the Production Area, thermal energy was not addressed in the specific procedures for the following machines: a/ SUMITOMO Injection Machine #6, m/n SH220C, s/n MOCM5015. b/ CINCINNATI Injection Machine #7, m/n VE-300-21, s/n W14A0195018. c/ CINCINNATI Injecton Machine #8, m/n VE-300-21, s/n W14A0196009. d/ VAN DORN 150 Ton Injection Machine #12, m/n 150RS12, s/n 150-RS-12F-1649. e/ BEKUM Extrusion Machine #51, m/n H-151-M, s/n 055579-5-007. f/ BEKUM Extrusion Machine #52, m/n H-151-M, s/n 055579-5-025. g/ BEKUM Extrusion Machine #53, m/n H-151-M, s/n 055579-5-016. h/ BEKUM Extrusion Machine #54, m/n H-151-M, s/n 0593 (P012094). i/ FISCHER Extrusion Machine #56, m/n 15-2, s/n 8824. j/ GRAHAM Extrusion Machine #201, m/n GEC4/600, s/n unknown. k/ JOMAR 175 Ton Injection Blow Mold Machine #303, M/N 175, S/N 5500-004. l/ JOMAR 85 Ton Injection Blow Mold Machine #306, m/n 85, s/n 85-113. m/ JOMAR 65 Ton Injection Blow Mold Machine #307, m/n 65, s/n 65-024. n/ JOMAR 85 Ton Injection Blow Mold Machine #308, m/n 85, s/n 85-131. o/ JOMAR 85 Ton Injection Blow Mold Machine #309, m/n 85-390, s/n 090. p/ UNILOY 189 Ton Injection Blow Mold Machine #314, m/n 189-3s, s/n 4605. q/ UNILOY 189 Ton Injection Blow Mold Machine #315, m/n 189, s/n 5021. r/ UNILOY 189 Ton Injection Blow Mold Machine #316, m/n 189, s/n 4950. s/ UNILOY 189 Ton Injection Blow Mold Machine #317, m/n 88, s/n 5056. t/ UNILOY 135 Ton Injection Blow Mold Machine #318, m/n 135, s/n 4539. u/ UNILOY 189 Ton Injection Blow Mold Machine #319, m/n 189, s/n 5063. v/ JOMAR 115 Ton Injection Blow Mold Machine #321, m/n 3000, s/n 3000-045. w/ JOMAR 115 Ton Injection Blow Mold Machine #332, m/n 3000, s/n 3000-057. x/ SUMITOMO SE350HDZ, Injecton Blow Mold Machine #3, m/n SE350HOZC1600, s/n MOA20342. y/ SUMITOMO SE280HDC1100 Injection Blow Mold Machine #4, m/n 7208-0004, s/n MOKQ8003. z/ SUMITOMO SE280HDC1600 Injection Blow Mold Machine #5, m/n 7208-0003, s/n MOKQ8002. aa/ UNILOY Injection Blow Mold Machine #302, m/n IBS189, s/n N3601AA010017. bb/ IBM 500/1350 Injection Blow Mold Machine #325, m/n IBM 500/1350, s/n 568212043. cc/ UNILOY Injection Blow Mold Machine #304, m/n UMIB, s/n M06J019.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: Inside of the Production Area, periodic inspections of the energy control procedures for the following machines were not performed: a/ SUMITOMO Injection Machine #6, m/n SH220C, s/n MOCM5015. b/ CINCINNATI Injection Machine #7, m/n VE-300-21, s/n W14A0195018. c/ CINCINNATI Injecton Machine #8, m/n VE-300-21, s/n W14A0196009. d/ VAN DORN 150 Ton Injection Machine #12, m/n 150RS12, s/n 150-RS-12F-1649. e/ BEKUM Extrusion Machine #51, m/n H-151-M, s/n 055579-5-007. f/ BEKUM Extrusion Machine #52, m/n H-151-M, s/n 055579-5-025. g/ BEKUM Extrusion Machine #53, m/n H-151-M, s/n 055579-5-016. h/ BEKUM Extrusion Machine #54, m/n H-151-M, s/n 0593 (P012094). i/ FISCHER Extrusion Machine #56, m/n 15-2, s/n 8824. j/ GRAHAM Extrusion Machine #201, m/n GEC4/600, s/n unknown. k/ JOMAR 175 Ton Injection Blow Mold Machine #303, M/N 175, S/N 5500-004. l/ JOMAR 85 Ton Injection Blow Mold Machine #306, m/n 85, s/n 85-113. m/ JOMAR 65 Ton Injection Blow Mold Machine #307, m/n 65, s/n 65-024. n/ JOMAR 85 Ton Injection Blow Mold Machine #308, m/n 85, s/n 85-131. o/ JOMAR 85 Ton Injection Blow Mold Machine #309, m/n 85-390, s/n 090. p/ UNILOY 189 Ton Injection Blow Mold Machine #314, m/n 189-3s, s/n 4605. q/ UNILOY 189 Ton Injection Blow Mold Machine #315, m/n 189, s/n 5021. r/ UNILOY 189 Ton Injection Blow Mold Machine #316, m/n 189, s/n 4950. s/ UNILOY 189 Ton Injection Blow Mold Machine #317, m/n 88, s/n 5056. t/ UNILOY 135 Ton Injection Blow Mold Machine #318, m/n 135, s/n 4539. u/ UNILOY 189 Ton Injection Blow Mold Machine #319, m/n 189, s/n 5063. v/ JOMAR 115 Ton Injection Blow Mold Machine #321, m/n 3000, s/n 3000-045. w/ JOMAR 115 Ton Injection Blow Mold Machine #332, m/n 3000, s/n 3000-057. x/ SUMITOMO SE350HDZ, Injecton Blow Mold Machine #3, m/n SE350HOZC1600, s/n MOA20342. y/ SUMITOMO SE280HDC1100 Injection Blow Mold Machine #4, m/n 7208-0004, s/n MOKQ8003. z/ SUMITOMO SE280HDC1600 Injection Blow Mold Machine #5, m/n 7208-0003, s/n MOKQ8002. aa/ UNILOY Injection Blow Mold Machine #302, m/n IBS189, s/n N3601AA010017. bb/ IBM 500/1350 Injection Blow Mold Machine #325, m/n IBM 500/1350, s/n 568212043. cc/ UNILOY Injection Blow Mold Machine #304, m/n UMIB, s/n M06J019.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.184 I01
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $5,000 · Current $0 Reduced
General-duty citation text
29 CFR 1910.184(i)(1): Each synthetic web sling(s) were not marked or coded to show the rated capacities for each type of hitch and type of synthetic web material: a/ Inside of the Tool Room, two yellow, synthetic web slings were unlabelled. These slings were used to lift metal molds in conjunction with the CM Lodestar Underslung Crane, CM Model W.
Recent events (2)
- — I (S) $0
- — Z (S) $5000
1910.184 I09 III
- Issued
- Mar 11, 2015
- Abate by
- Apr 27, 2015
- Penalty
- Initial $0 · Current $1,750
General-duty citation text
29 CFR 1910.184(i)(9)(iii): Synthetic web sling(s) with snags, punctures, tears, or cuts were not immediately removed from service: a/ Inside of the Tool Room, two yellow, synthetic web slings were badly frayed and torn. These slings were used to lift metal molds in conjunction with the CM Lodestar Underslung Crane, CM Model W.
Recent events (2)
- — I (S) $1750
- — Z (S) $0
More inspections at Pretium Packaging LLC
View Pretium Packaging LLC's full OSHA safety record →
More inspections in this industry (NAICS 326160)
More inspections in MO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340443860.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.