Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PENNSYLVANIA STEEL COMPANY, INC

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of PENNSYLVANIA STEEL COMPANY, INC in 1139 LEHIGH AVENUE, WHITEHALL, PA 18052 (NAICS 423510). OSHA activity number 340735398.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Pennsylvania Steel Company, INC — free Get an email when a new federal OSHA severe-injury report for Pennsylvania Steel Company, INC is published. One employer, no account, unsubscribe in one click.
Site address
1139 LEHIGH AVENUE
City
WHITEHALL
State
PA
ZIP
18052
Mailing
1139 LEHIGH AVENUE, WHITEHALL, PA 18052
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423510
Employees
41
Ownership type
A

3 citations on file for this inspection.

1910.95 G01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 27, 2015
Abate by
Aug 29, 2015
Penalty
Initial $4,250 · Current $4,250

Hazardous substances 81108111

29 CFR 1910.95(g)(1): The employer did not establish and maintain an audiometric testing program as provided by 29 CFR 1910.95(g) by making audiometric testing available to all employees whose exposures equal or exceed an 8-hour time-weighted average of 85 decibels:   a) Old Saw: A saw operator cutting material was exposed to continuous noise above the action level and an audiometric testing program was not established and maintained, on or about July 13, 2015. (See Citation 1.1a for full description)  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $4250
  • — Z (S) $4250

1910.95 K01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 27, 2015
Abate by
Aug 29, 2015
Penalty
Initial $0 · Current $0

Hazardous substances 81108111

29 CFR 1910.95(k)(1): The employer did not train each employee who is exposed to noise at or above an 8-hour time-weighted average of 85 decibels in accordance with the requirements of 29 CFR 1910.95(k). The employer did not institute a training program and ensure employee participation in the program:  a) Old Saw: A saw operator cutting material was exposed to continuous noise above the action level and a hearing conservation training program was not established and maintained, on or about July 13, 2015. (See Citation 1.1a for full description)  Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.95 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Jul 27, 2015
Abate by
Oct 28, 2015
Penalty
Initial $4,250 · Current $0 Reduced

Hazardous substances 81108111

29 CFR 1910.95(b)(1): When employees were subjected to sound exceeding those listed in Table G-16, feasible administrative or engineering controls were not utilized:    a) Old Saw: An employee, Saw Operator, cutting material was exposed to continuous noise at 133.8% of the permissible exposure level of 90 dBA or an eight-hour time-weighted average of 92.3 dBA. This exposure was observed over a 463 minute sampling period on July 13, 2015.      Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement.  Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $0
  • — Z (S) $4250

View Pennsylvania Steel Company, INC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340735398.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.