OSHA Inspection: DANIEL F. SMITH ROOFING, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of DANIEL F. SMITH ROOFING, INC. in 81 MAIN STREET, MCSHERRYSTOWN, PA 17344 (NAICS 238160). OSHA activity number 340806017.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Daniel F. Smith Roofing, INC. — free Get an email when a new federal OSHA severe-injury report for Daniel F. Smith Roofing, INC. is published. One employer, no account, unsubscribe in one click.
Site address
81 MAIN STREET
City
MCSHERRYSTOWN
State
PA
ZIP
17344
Mailing
354 MAPLE AVE, HANOVER, PA 17331
Inspection type
Referral (C)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238160
Employees
3
Ownership type
A

4 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Nov 25, 2015
Abate by
Dec 15, 2015
Penalty
Initial $1,600 · Current $1,050 Reduced
29 CFR 1926.100(a): Employees were not protected by protective helmets while working in areas where there was a possible danger of head injury from impact, or from falling or flying objects, or from electrical shock and burns:   a) 81 Main Street Mcsherrystown, PA; An employee was cutting metal on the ground work area without a hardhat while workers were installing a roof above, on or about 07/27/2015.   Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1050
  • — Z (S) $1600

1926.453 B02 V

Serious Gravity 5 1 instance 1 exposed
Issued
Nov 25, 2015
Abate by
Dec 15, 2015
Penalty
Initial $2,000 · Current $1,300 Reduced
29 CFR 1926.453(b)(2)(v): A body belt with lanyard attached to the boom or basket was not worn by employee(s) working from an aerial lift:   a) 81 Main Street Mcsherrystown, PA; An employee was working in a Versalift Aerial Lift Model Number TEL29N without the use of fall protection while assisting an employee that was working on the roof work area, on or about 07/27/2015.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $1300
  • — Z (S) $2000

1926.454 A

Serious Gravity 1 1 instance 1 exposed
Issued
Nov 25, 2015
Abate by
Dec 15, 2015
Penalty
Initial $1,200 · Current $800 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:   a) 81 Main Street Mcsherrystown, PA; Employees that were performing work in a Versalift Aerial Lift Model Number TEL29N were not trained in the subject matter to recognize hazards associated with the aerial lift, on or about 07/27/2015.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • — I (S) $800
  • — Z (S) $1200

1926.501 B13

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 25, 2015
Abate by
Dec 15, 2015
Penalty
Initial $2,800 · Current $1,850 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501 (b):   a) 81 Main Street Mcsherrystown, PA; Employees were installing a new metal roof on an 8/12 pitch residential roof 20 inch 6 inches above the ground without the use of fall protection, on or about 07/27/2015.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (2)
  • — I (S) $1850
  • — Z (S) $2800

View Daniel F. Smith Roofing, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340806017.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.