TAMUNING, GU —
OSHA Inspection: G.C. GOZUM CONSTRUCTION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of G.C. GOZUM CONSTRUCTION in DFS/MICROPAC INC., COMPLEX CHALAN SAN ANTONIO RD., TAMUNING, GU 96913 (NAICS 238320). OSHA activity number 340932904.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- G.C. GOZUM CONSTRUCTION
- Site address
- DFS/MICROPAC INC., COMPLEX CHALAN SAN ANTONIO RD.
- City
- TAMUNING
- State
- GU
- ZIP
- 96913
- Mailing
- P.O. BOX 11012, TAMUNING, GU 96931
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238320
- Employees
- 25
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.451 G01
- Issued
- Oct 19, 2015
- Abate by
- Oct 29, 2015
- Penalty
- Initial $1,600 · Current $1,120 Reduced
General-duty citation text
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section: a. On September 22, 2015, an employee working from the tubular welded frame scaffold was not protected from falling 11-feet, 6-inches to the lower level.
Recent events (2)
- — I (S) $1120
- — Z (S) $1600
1926.451 B01
- Issued
- Oct 19, 2015
- Abate by
- Oct 29, 2015
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On September 22, 2015, the tubular welded frame scaffold was not fully planked, exposing employees to about a 4-foot fall to the concrete surface below.
Recent events (2)
- — I (O) $0
- — Z (O) $0
More inspections at G.C. Gozum Construction
View G.C. Gozum Construction's full OSHA safety record →
More inspections in this industry (NAICS 238320)
More inspections in GU
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340932904.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.