BLUE ASH, OH —
OSHA Inspection: WESTROCK CP, LLC
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of WESTROCK CP, LLC in 9960 ALLIANCE RD., BLUE ASH, OH 45242 (NAICS 322212). OSHA activity number 340976414.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- WESTROCK CP, LLC
- Site address
- 9960 ALLIANCE RD.
- City
- BLUE ASH
- State
- OH
- ZIP
- 45242
- Mailing
- 9960 ALLIANCE RD., CINCINNATI, OH 45242
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 322212
- Employees
- 170
- Ownership type
- A
Citations
4 citations on file for this inspection.
1910.147 C04 I
- Issued
- Mar 25, 2016
- Abate by
- Apr 20, 2016
- Penalty
- Initial $6,300 · Current $4,410 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(i): Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. Note: Exception: The employer need not document the required procedure for a particular machine or equipment, when all of the following elements exist: (1) The machine or equipment has no potential for stored or residual energy or reaccumulation of stored energy after shut down which could endanger employees; (2) the machine or equipment has a single energy source which can be readily identified and isolated; (3) the isolation and locking out of that energy source will completely deenergize and deactivate the machine or equipment; (4) the machine or equipment is isolated from that energy source and locked out during servicing or maintenance; (5) a single lockout device will achieve a locker-out condition; (6) the lockout device is under the exclusive control of the authorized employee performing the servicing or maintenance; (7) the servicing or maintenance does not create hazards for other employees; and (8) the employer, in utilizing this exception, has had no accidents involving the unexpected activation or reenergization of the machine or equipment during servicing or maintenance. (a) On October 9, 2015, maintenance employees working on the register motor that turns the die cut register on the #123 Ward Line, did not utilize the entire energy isolating procedure, in that the employees only locked out one electrical disconnect while the companys machine specific energy isolating procedure required the isolation of multiple electric, pneumatic, and hydraulic energy sources. (b) On October 9, 2015, a maintenance employee who climbed inside the Martin Stacker on the #123 Ward Line to reach some grease points, did not utilize the entire energy isolating procedure, in that the employee only locked out one electrical disconnect while the companys machine specific energy isolating procedure required the isolation of multiple electric, pneumatic, hydraulic and gravity energy sources. (c) Employees working on equipment in the Boiler Room, such as the boiler, the deaerator (DA) and the vertical tank, did not utilize specific energy isolating procedures.
Recent events (2)
- — I (S) $4410
- — Z (S) $6300
1910.147 C06 I
- Issued
- Mar 25, 2016
- Abate by
- Jun 30, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed: (a) The periodic inspection was inadequate, in that it failed to catch the deviation between the written machine specific energy isolation procedures on the #120 Titan Line, #122 Ward Line, #123 Ward Line, #134 Flexo Line, #135 Mini Flexo, #136 Flexo Line and the Post Folder-Gluer Line #142 and the energy isolation procedures actually followed by employees conducting maintenance activities on the machines.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C07 I
- Issued
- Mar 25, 2016
- Abate by
- Jun 30, 2016
- Penalty
- Initial $6,300 · Current $4,410 Reduced
General-duty citation text
29 CFR 1910.147(c)(7)(i): The employer shall provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. The training shall include the following: (a) On October 9, 2015, maintenance employees working on the register motor that turns the die cut register on the #123 Ward Line, were not adequately trained on the safe application, usage and removal of energy control devices in that the employees did not understand the need to follow the companys written energy isolating procedure for the #123 Ward Line. (b) On October 9, 2015, a maintenance employee working on the Martin Stacker on the #123 Ward Line was not adequately trained on the safe application, usage and removal of energy control devices in that the employees did not understand the need to follow the companys written energy isolating procedure for the #123 Ward Line.
Recent events (2)
- — I (S) $4410
- — Z (S) $6300
1910.147 D
- Issued
- Mar 25, 2016
- Abate by
- Apr 20, 2016
- Penalty
- Initial $6,300 · Current $0 Reduced
General-duty citation text
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: (a) Employees set up the #120 Titan Line, #122 Ward Line, #123 Ward Line, #134 Flexo Line, #135 Mini Flexo, #136 Flexo Line and the Post Folder-Gluer Line #142, without first isolating the electric, pneumatic, gravity and hydraulic energy sources and then affixing a lockout device, as needed, to each energy isolating device.
Recent events (2)
- — I (S) $0
- — Z (S) $6300
More inspections at Westrock CP, LLC
View Westrock CP, LLC's full OSHA safety record →
More inspections in this industry (NAICS 322212)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 340976414.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.