OSHA Inspection: MINCEY MARBLE MANUFACTURING, INC.

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of MINCEY MARBLE MANUFACTURING, INC. in 4321 BROWNS BRIDGE RD., GAINESVILLE, GA 30504 (NAICS 326199). OSHA activity number 341093821.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Mincey Marble Manufacturing, INC. — free Get an email when a new federal OSHA severe-injury report for Mincey Marble Manufacturing, INC. is published. One employer, no account, unsubscribe in one click.
Site address
4321 BROWNS BRIDGE RD.
City
GAINESVILLE
State
GA
ZIP
30504
Mailing
4321 BROWNS BRIDGE RD., GAINESVILLE, GA 30504
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
326199
Employees
196
Ownership type
A

5 citations on file for this inspection.

1910.133 A03

Serious Gravity 1 1 instance 3 exposed
Issued
Feb 8, 2016
Penalty
Initial $2,250 · Current $1,575 Reduced
29 CFR 1910.133(a)(3): The employer did not ensure that each affected employee who wore prescription lenses while engaged in operations that involved eye hazards wore eye protection that incorporated the prescription in its design, or wore eye protection that could be worn over the prescription lenses without disturbing the proper position of the prescription lenses or the protective lenses.  Mincey Marble Mfg, Inc., 4321 Browns Bridge Rd, Gainesville, GA - Employees wearing prescription glasses were observed sanding and grinding without proper eye protection, on or about 12/2/15.
Recent events (2)
  • — I (S) $1575
  • — Z (S) $2250

1910.151 C

Serious Gravity 5 1 instance 2 exposed
Issued
Feb 8, 2016
Penalty
Initial $3,188 · Current $2,223 Reduced

Hazardous substances 1750

29 CFR 1910.151(c): Where employees were exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body were not provided within the work area for immediate emergency use:  Mincey Marble Mfg, Inc., 4321 Browns Bridge Rd, Gainesville, GA - An employee was instructed to pour MEKP into the a container at the auto caster machine. A suitable emergency eye wash station was not provided for immediate use, on or about 12/2/15.
Recent events (2)
  • — I (S) $2223
  • — Z (S) $3188

1910.178 L04 I

Other-than-serious 1 instance 4 exposed
Issued
Feb 8, 2016
Abate by
Mar 25, 2016
Penalty
Initial $750 · Current $525 Reduced
29 CFR 1910.178(l)(4)(i): 1910.178(l)(4)(iii): An evaluation of each powered industrial truck operator's performance was not conducted at least once every three years.  Mincey Marble Mfg, Inc., 4321 Browns Bridge Rd, Gainesville, GA - Some of the employees operating forklifts were trained and certified in 2010. An evaluation of their performance was not conducted every three years, on or about 12/2/15.
Recent events (2)
  • — I (O) $525
  • — Z (O) $750

1910.178 L06

Other-than-serious 1 instance 1 exposed
Issued
Feb 8, 2016
Abate by
Mar 25, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.178(l)(6): At this establishment, the employer did not certify that each operator has been trained and evaluated to operate the powered industrial truck as required by this paragraph (l). The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation.  Mincey Marble Mfg, Inc., 4321 Browns Bridge Rd, Gainesville, GA - In the shipping department, the employer did not certify the evaluation of the competency of an employee who had been previously trained, on or about 12/2/15.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.1000 E

Other-than-serious 1 instance 5 exposed
Issued
Feb 8, 2016
Abate by
Aug 9, 2016
Penalty
Initial $750 · Current $525 Reduced

Hazardous substances 9135

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d):  Mincey Marble Mfg., Inc., 4321 Browns Bridge Rd, Gainesville, GA - An employee grinding in the grinding room of the finishing department was exposed to total dust levels of 27 milligrams per cubic meter (mg/m3), 1.7 times the permissible exposure limit (PEL) of 15 mg/m3. The exposure was derived from a sample taken over 465 minutes. Engineering controls had not implemented in this area to achieve compliance, on or 12/10/2015.  General methods of control applicable in these circumstances include, but are not limited to the following:  1.  Install local exhaust ventilation system attached to each grinder  2.  Increase dilution ventilation in the area.  However, other methods of abatement may be equally, or more appropriate.  Ultimate responsibility for determining the most appropriate abatement method rests with the employer given its superior knowledge of the specific conditions at its worksite.  Abatement Schedule  Step 1 -   A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to hazardous substances as referenced in this citation. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation:  (1)  Evaluation of engineering/administrative control options; (2)  Selection of optimum control methods and completion of design; (3)  Procurement, installation and operation of selected control measures: (4)  Testing and acceptance or modification/redesign of controls.  All proposed control measures shall be approved for each particular use by a competent industrial hygienist or other technically qualified person. 60-day progress reports are required during the abatement period.  Step 2 -  Abatement shall have been completed by the implementation of feasible engineering and /or administrative controls upon verification of
Recent events (2)
  • — I (O) $525
  • — Z (O) $750

View Mincey Marble Manufacturing, INC.'s full OSHA safety record →