OSHA Inspection: SC CARPENTRY LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SC CARPENTRY LLC in 2310 KING PL NW, WASHINGTON, DC 20008 (NAICS 238130). OSHA activity number 341102788.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch SC Carpentry LLC — free Get an email when a new federal OSHA severe-injury report for SC Carpentry LLC is published. One employer, no account, unsubscribe in one click.
Establishment
SC CARPENTRY LLC
Site address
2310 KING PL NW
City
WASHINGTON
State
DC
ZIP
20008
Mailing
338 N. SUMMIT AVE #102, GAITHERSBURG, MD 20877
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
4
Ownership type
A

9 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $1,600 · Current $1,600
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:   a) On or about December 7, 2015; front of residential home (eastside); Employee working on the ground level providing supplies to the employees on the scaffold was not wearing any head protection exposing him to a struck by hazard.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1600

1926.404 B01 II

Serious Gravity 1 1 instance 1 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $1,200 · Current $1,200
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupers for personal protection  a) On or about December 7, 2015; front of residential home (eastside) portable electrical tools, such as but not limited to saws that were in use, were not plugged into a ground fault circuit interrupter exposing them to a shock hazard.     Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $1200

1926.404 F06

Serious Gravity 5 1 instance 1 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous:   a) On or about December 7, 2015; front of residential home (eastside); the portable extension cord used to provide power to the circular saw had the ground pin missing.    Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
  • — Z (S) $0

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no  a) On or about December 7, 2015; front of residential home (eastside); employees were observed working on the top tier of a scaffold system that was not fully planked exposing them to an estimated fall of 20 feet to ground level. The platform in which the employees were working on only had two planks.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

1926.451 E09 IV

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress.   a) On or about December 7, 2015; front of residential home (eastside), employees were observed climbing the cross braces to access the working platform and to access the extension ladder exposing them to a 20 foot fall to ground level.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G01 VII

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.  a) On or about December 7, 2015; front of residential home (eastside); employees were exposed to an estimated fall of 20 feet while working on an unguarded scaffold system; railing or a personal fall arrest system was not used.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G04 I

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews:   a) On or about December 7, 2015; front of residential home (eastside); the scaffold system used in the installation of the siding did not have the ends of the working platform guarded exposing employees to a 20-foot fall to ground level.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.451 G04 IV

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(4)(iv): Midrails were not installed at a height approximately midway between the top edge of the guardrail system and the platform surface:   a) On or about December 7, 2015; front of residential home (eastside) employees were observed working on a scaffold system in which mid-rails were not installed on the working platform exposing employees to an estimated 20 foot fall to ground level.   Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $0

1926.1053 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 11, 2016
Abate by
Mar 30, 2016
Penalty
Initial $2,800 · Current $2,800
29 CFR 1926.1053(b)(1): Where portable ladders were used for access to an upper landing surface and the ladder's length allows, the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface being accessed:   a) On or about December 7, 2015; front of residential home (eastside); employees were using a ladder to access the working platform of a scaffold system that was extended eighteen inches above the landing exposing them to a potential fall hazard.    Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.
Recent events (1)
  • — Z (S) $2800

View SC Carpentry LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341102788.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.