OSHA Inspection: COL-PUMP COMPANY, INC.

Referral inspection · Health discipline

On , OSHA opened a referral health inspection of COL-PUMP COMPANY, INC. in 131 E RAILROAD ST, COLUMBIANA, OH 44408 (NAICS 331523). OSHA activity number 341257152.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Col-Pump Company, INC. — free Get an email when a new federal OSHA severe-injury report for Col-Pump Company, INC. is published. One employer, no account, unsubscribe in one click.
Site address
131 E RAILROAD ST
City
COLUMBIANA
State
OH
ZIP
44408
Mailing
131 E RAILROAD ST, COLUMBIANA, OH 44408
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
331523
Employees
40
Ownership type
A

5 citations on file for this inspection.

1910.242 A

Serious Gravity 10 1 instance 5 exposed
Issued
May 2, 2016
Abate by
May 20, 2016
Penalty
Initial $4,900 · Current $800 Reduced
29 CFR 1910.242(a): Hand and portable powered tools or equipment were not kept in safe condition:     On or about February 17, 2016, employees utilizing a Top Cat 56AH Horizontal Grinder utilized an incompatible Type 27 wheel and did not have a guard in place while grinding castings.
Recent events (2)
  • — I (S) $800
  • — Z (S) $4900

1910.243 C01

Serious Gravity 10 1 instance 5 exposed
Issued
May 2, 2016
Abate by
May 20, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.243(c)(1): Abrasive wheel(s) were used on portable grinder(s) which were not provided with safety guard(s) meeting the requirements specified in 29 CFR 1910.243(c)(1) through (c)(4)(a):  a. On or about February 17, 2016, employees utilized a Top Cat 54VL Vertical Grinder with a type 11 cup wheel that did not have a guard in place while grinding castings.   b. On or about February 17, 2016, employees utilized a Top Cat 56AH Horizontal Grinder with a type 27 wheel that did not have a guard in place while grinding castings.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1000 C

Serious Gravity 5 1 instance 5 exposed
Issued
May 2, 2016
Abate by
Nov 15, 2016
Penalty
Initial $3,500 · Current $1,700 Reduced

Hazardous substances 9010

29 CFR 1910.1000(c): An employee was exposed to silica in excess of the 8-hour time weighted average limits of 1.351 mg/m3 listed in Table Z-3:    On March 14, 2016, an employee performing grinding operations was exposed to silica at an 8-hour time weighted average of 1.594 mg/m3, which is approximately 1.18 times the permissible exposure limit (PEL) of 1.351 mg/m3, for 432 minutes. The exposure level is derived from 1 sample collected over a 432 minute period of time, and zero exposure is assumed for the time not sampled.
Recent events (2)
  • — I (S) $1700
  • — Z (S) $3500

1910.1000 E

Serious Gravity 5 1 instance 5 exposed
Issued
May 2, 2016
Abate by
Nov 15, 2016
Penalty
Initial $0 · Current $0

Hazardous substances 9010

29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d):     On March 14, 2016, an employee performing grinding operations was exposed to silica at an 8-hour time weighted average of 1.594 mg/m3, which is approximately 1.18 times the permissible exposure limit (PEL) of 1.351 mg/m3, for 432 minutes. The exposure level is derived from 1 sample collected over a 432 minute period of time, and zero exposure is assumed for the time not sampled.       General methods of control applicable in this circumstance include, but are not limited to the following:    1) Re-evaluate, maintain, upgrade or otherwise install ventilation system(s) to improve air movement/ensure capture lead dust generated while finishing castings;     ABATEMENT NOTE:        STEP 1: An effective respiratory protection program shall be implemented and used by the affected employee(s) as an interim measure of protection.       Abatement Date: 15 calendar days from the issuance date      STEP 2: A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to silica as referenced in this citation.  This plan shall include, at a minimum, target dates for the following actions, which must be consistent with the dates required by this citation:       (1) Evaluation of engineering / administrative controls;   (2) Selection of optimum control methods and completion of design;   (3) Procurement, installation and operation of selected control measures;   (4) Testing and acceptance or modification /redesign of controls.       All proposed control measures shall be evaluated for each particular use by a competent industrial hygienist or other technically qualified person(s). 15-day progress reports to OSHA are required during the abatement period.       Abatement Date: 30 calendar days from the issuance date       STEP 3: Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance.       Abatement Date: 60 calendar days from the issuance date
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.95 B01

Repeat Gravity 5 1 instance 5 exposed
Issued
May 2, 2016
Abate by
Jan 13, 2017
Penalty
Initial $7,000 · Current $3,500 Reduced

Hazardous substances 81108111

29 CFR 1910.95(b)(1): When employees were subjected to sound exceeding those listed in Table G-16, feasible administrative or engineering controls were not utilized:    a. On March 14, 2016, a Quest NoisePro Dosimeter (sn: NLI120009) was placed on an employee performing grinding operations for a total of 433 minutes. The employee was exposed to noise at 646.9% of the permissible daily noise exposure level, with an equivalent time-weighted average sound level of 103.4 dBA. Exposure calculations include a zero increment for the 47 minutes not sampled.    b. On March 14, 2016, a Quest Noisepro Dosimeter (sn: NLI120010) was placed on an employee performing grinding operations for a total of 437 minutes. The employee was exposed to noise at 447.7% of the permissible daily noise exposure level, with an equivalent time-weighted average sound level of 100.8 dBA. Exposure calculations include a zero increment for the 43 minutes not sampled.    General methods of control applicable in this circumstance include, but are not limited to the following:    1) Installation of mufflers on the grinders to reduce noise from the exhaust ports.    2) Replacement of air powered grinders with electric powered tools or different model.    3) Separation of workers by distance or through the use of partitions and soundproofing surfaces so that employees do not receive noise from adjacent workers.    ABATEMENT NOTE:        STEP 1: An effective hearing conservation program shall be implemented and used by the affected employee(s) as an interim measure of protection.       Abatement Date: 15 calendar days from the issuance date      STEP 2: A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to noise as referenced in this citation.  This plan shall include, at a minimum, target dates for the following actions, which must be consistent with the dates required by this citation:       (1) Evaluation of engineering / administrative controls;   (2) Selection of optimum control methods and completion of design;   (3) Procurement, installation and operation of selected control measures;   (4) Testing and acceptance or modification /redesign of controls.       All proposed control measures shall be evaluated for each particular use by a competent industrial hygienist or other technically qualified person(s). 15-day progress reports to OSHA are required during the abatement period.       Abatement Date: 30 calendar days from the issuance date       STEP 3: Abatement shall have been completed by the implementation of feasible engineering and/or administrative controls upon verification of their effectiveness in achieving compliance.       Abatement Date: 60 calendar days from the issuance date        COL Pump Company, Inc. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 1910.95(b)(1), which was contained in OSHA inspection number 638358, citation number 3, item number 1, and was affirmed as a final order on January 23, 2013, with respect to a workplace located at 131 E. Railroad Street, Columbiana, OH 44408.
Recent events (2)
  • — I (R) $3500
  • — Z (R) $7000

View Col-Pump Company, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341257152.