OSHA Inspection: ADVANCE CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ADVANCE CONSTRUCTION, INC. in 309 W. MAIN ST, WAUKESHA, WI 53186 (NAICS 237110). OSHA activity number 341340735.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Advance Construction, INC. for free Get an email when a new federal OSHA severe-injury report for Advance Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
309 W. MAIN ST
City
WAUKESHA
State
WI
ZIP
53186
Mailing
2141 WOODALE AVE, GREEN BAY, WI 54313
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237110
Employees
36
Ownership type
Private (A)

1 citation on file for this inspection.

1926.652 D01

Serious Gravity 1 2 instances 5 exposed
Issued
Jul 28, 2016
Abate by
Aug 3, 2016
Penalty
Initial $1,785 · Current $1,500 Reduced
29 CFR 1926.652(d)(1): Materials and equipment used for protective systems were not free from damage or defects that might impair their proper function:     (a) Trench Box 83: On the morning of March 22nd, 2016 a competent person did not ensure that manufactured spreader bar pins were in place in spreader bars of the trench box that was in use.  A spreader bar pin was not inserted fully through the openings of a lower spreader bar connection point and secured with a cotter pin. The spreader bar pin was to short and held in place with tape.    (b) Trench Box 91: The trench box vertical channel welded to the inside walls of the trench box, and allows adjustable spreader bars to be adjusted up and down, had broken welds.  Additionally, the trench box inside and outside walls had several large puncture holes that exposed the interior structure of the box.
Recent events (2)
  • · I (S) $1500
  • · Z (S) $1785

View Advance Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 341340735.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.