Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: PARK CONSTRUCTION CORP.

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of PARK CONSTRUCTION CORP. in 2125-2143 ELM STREET, MANCHESTER, NH 03111 (NAICS 236210). OSHA activity number 341401115.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Park Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Park Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
2125-2143 ELM STREET
City
MANCHESTER
State
NH
ZIP
03111
Mailing
138 NH ROUTE 119 EAST, FITZWILLIAM, NH 03447
Inspection type
Unprogrammed Other (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236210
Employees
50
Ownership type
A

5 citations on file for this inspection.

1926.651 C02

Serious Gravity 10 1 instance 2 exposed
Issued
May 10, 2016
Penalty
Initial $5,390 · Current $2,310 Reduced
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees:    (a) Jobsite - Employees were working in a 42' long trench with no ladder for access.    Park Construction Corp. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29CFR1926.652(g)(1)(iii), which was contained in OSHA inspection number 1052949, citation number 01, item number 02, and was affirmed as a final order on 07/09/15, with respect to a workplace located at Kosciuszko St. Manchester, NH.
Recent events (2)
  • — I (S) $2310
  • — Z (S) $5390

1926.1051 A

Serious Gravity 10 1 instance 2 exposed
Issued
May 10, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.1051(a): 29 CFR 1926.1051(a):  Stairways or ladders were not provided at all personnel points of access where there was a break in elevation of 19 inches (48 cm) or more, and no ramp, runway, sloped embankment, or personnel hoist was provided:  (a) Jobsite - The employees had to climb up a three foot pipe to exit the eight foot deep excavation.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.652 E02 I

Serious Gravity 5 1 instance 2 exposed
Issued
May 10, 2016
Penalty
Initial $4,620 · Current $0 Reduced
29 CFR 1926.652(e)(2)(i):   Excavation of material to a level no greater than 2 feet (.61 m) below the bottom of the members of a support system shall be permitted, but only if the system is designed to resist the forces calculated for the full depth of the trench, and there are no indications while the trench is open of a possible loss of soil from behind or below the bottom of the support system.    (a) Material was excavated greater than 3 feet below the bottom of Trench Box.  -
Recent events (2)
  • — I (S) $0
  • — Z (S) $4620

1926.651 J02

Repeat Gravity 10 1 instance 2 exposed
Issued
May 10, 2016
Penalty
Initial $10,780 · Current $6,468 Reduced
29 CFR 1926.651(j)(2):   Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.    (A) Jobsite - Employees were not protected from excavated spoils piles that could pose a hazard by falling or rolling into excavations as required.  -  The Park Construction Corp. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29CFR1926.651(j)(2), which was contained in OSHA inspection number 1052949, citation number 01, item number 01b, and was affirmed as a final order on 07/09/15, with respect to a workplace located at Kosciuszko St., Manchester, NH.
Recent events (2)
  • — I (R) $6468
  • — Z (R) $10780

1926.652 A01

Repeat Gravity 10 1 instance 2 exposed
Issued
May 10, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c):    (a) Jobsite - Employees were exposed to a cave-in hazard while working in 8 foot deep, 9 foot wide by 22 feet long class C soil trench with no cave-in protection.  The Park Construction Corp. was previously cited for a violation of this occupational safety and health standard or its equivalent standard 29CFR1926.652(a)(1), which was contained in OSHA inspection number 1052949, citation number 01, item number 01c, and was affirmed as a final order on 07/09/15, with respect to a workplace located at Kosciuszko St., Manchester, NH.
Recent events (2)
  • — I (R) $0
  • — Z (R) $0

View Park Construction Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341401115.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.