FORT BELVOIR, VA —
OSHA Inspection: HAS CONSTRUCTION LLC
Complaint inspection · Health discipline
At a glance
On , OSHA opened a complaint health inspection of HAS CONSTRUCTION LLC in 5975 MIDDLETOWN RD BUILDING 1189, FORT BELVOIR, VA 22060 (NAICS 236220). OSHA activity number 341403970.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- HAS CONSTRUCTION LLC
- Site address
- 5975 MIDDLETOWN RD BUILDING 1189
- City
- FORT BELVOIR
- State
- VA
- ZIP
- 22060
- Mailing
- 2811 PENNSYLVANIA AVENUE SE SUITE 201, WASHINGTON, DC 20020
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Health
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 236220
- Employees
- 14
- Ownership type
- A
Citations
8 citations on file for this inspection.
1910.178 A04
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $4,276 · Current $4,276
General-duty citation text
29 CFR 1910.178(a)(4): Modifications and additions which affect capacity and safe operation of powered industrial truck were performed by the employer without the manufacturer's prior written approval. a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, the employer did not obtain manufacturer's prior written approval where employees performed demolition of a concrete vault by free rigging from the tines of a Kamatsu forklift Model FG45T8, serial #136243A, exposing employees to crushing injuries. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $4276
1926.501 B01
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $4,276 · Current $4,276
General-duty citation text
29 CFR 1926.501(b)(1): Each employee on a walking/working surface with an unprotected side or edge which was 6 feet (1.8 m) or more above a lower level was not protected from falling by the use of guardrail systems, safety net systems, or personal fall arrest systems. a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, employees that performed work on a concrete vault with an approximately 8'8" top-of-vault to floor fall distance, were not protected from fall hazards by the use of guardrail systems, safety net systems, or personal fall arrest systems, exposing the employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $4276
1926.502 D15
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(15): Anchorage used for attachment for personal fall arrest equipment was not capable of supporting at least 5,000 pounds (22.2 kN) per employee attached nor was it designed, installed and used as follows: As part of a complete personal fall arrest system which maintains a safety factor of at least two; and under the supervision of a qualified person. a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, employees that performed work on a concrete vault with an approximately 8'8" top-of-vault to floor fall distance, used an anchorage that was not designed, installed and used as part of a complete personal fall arrest system and under the supervision of a qualified person, exposing the employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.502 D16 III
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.502(d)(16)(iii): Personal fall arrest systems, when stopping a fall, were not rigged such that an employee could not free fall more than 6 feet (1.8 m) nor contact any lower level: a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, employees that performed work on a concrete vault with an approximately 8'8" top-of-vault to floor fall distance, used shock absorbing lanyards that were rigged such that in the event of a fall employees could contact the floor, exposing the employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.503 A02 III
- Issued
- Sep 27, 2016
- Abate by
- Nov 15, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.503(a)(2)(iii): The employer did not assure that each employee has been trained, as necessary, by a competent person in the use and operation of guardrail systems, personal fall arrest systems, safety net systems, warning line systems, safety monitoring systems, controlled access zones, and other protection to be used. a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, employees that performed work on a concrete vault with an approximately 8'8" top-of-vault to floor fall distance, were not provided training by a competent person in the use of personal fall arrest systems, exposing the employees to fall hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.1101 G08 I D
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $2,138 · Current $2,138
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(D): All scraping of residual adhesive and/or backing was not performed using wet methods: a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, employees did not use wet methods to remove residual adhesive, where employees removed vinyl and asphalt flooring materials down to bare concrete using a National Model 5600 Floor Stripper and push brooms, in a building constructed in approximately 1969, exposing employees to potential health hazards of inhalation of asbestos. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $2138
1926.1101 G08 I E
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(E): Dry sweeping was not prohibited: a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, the employer did not prohibit dry sweeping where employees removed vinyl and asphalt flooring materials down to bare concrete using a National Model 5600 Floor Stripper and push brooms, in a building constructed in approximately 1969, exposing employees to potential health hazards of inhalation of asbestos. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
1926.1101 G08 I I
- Issued
- Sep 27, 2016
- Abate by
- Oct 24, 2016
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.1101(g)(8)(i)(I): Resilient flooring material including associated mastic and backing were not determined to be asbestos-free using recognized analytical techniques: a) 5975 Middleton Rd, Building 1189, Fort Belvoir, VA: On or about April 6, 2016, and times prior thereto, where employees removed vinyl and asphalt flooring materials down to bare concrete, in a building constructed in approximately 1969, the employer did not verify the absence of asbestos-containing materials using recognized analytical techniques, exposing employees to potential health hazards of inhalation of asbestos. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (1)
- — Z (S) $0
More inspections at HAS Construction LLC
View HAS Construction LLC's full OSHA safety record →
More inspections in this industry (NAICS 236220)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341403970.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.