Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: ABR BUILDERS LLC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ABR BUILDERS LLC. in 280 HENRY ST., BROOKLYN, NY 11201 (NAICS 238140). OSHA activity number 341566156.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ABR Builders LLC. — free Get an email when a new federal OSHA severe-injury report for ABR Builders LLC. is published. One employer, no account, unsubscribe in one click.
Establishment
ABR BUILDERS LLC.
Site address
280 HENRY ST.
City
BROOKLYN
State
NY
ZIP
11201
Mailing
39 W. 38TH ST., NEW YORK, NY 10018
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Last modified
Data loaded
NAICS code
238140
Employees
60
Ownership type
A

8 citations on file for this inspection.

1926.100 A

Serious Gravity 5 1 instance 2 exposed
Issued
Oct 22, 2016
Abate by
Oct 28, 2016
Penalty
Initial $6,236 · Current $6,236
29 CFR 1926.100(a): Employees working in areas where there was a possible danger of head injury from impact, or falling or flying objects, or from electrical shock and burns, were not protected by protective helmets:   a) Worksite -  An employee was installing brick on a three story residential home while working from a fabricated frame scaffold.  The employees walking and working under the overhead brick work were exposed to being struck by falling bricks and other materials; on or about 6/20/16.   Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (S) $6236
  • — C (S) $6236
  • — Z (S) $6236

1926.451 G01 VII

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 22, 2016
Abate by
Oct 28, 2016
Penalty
Initial $6,236 · Current $6,236
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section.   a)    Worksite - Employee was installing brick on a three story residential home while working from a fabricated frame scaffold.  Employee was working approximately 11ft above the ground below without a means of fall protection; on or about 6/20/16.    Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (S) $6236
  • — C (S) $6236
  • — Z (S) $6236

1926.451 H02 II

Serious Gravity 5 1 instance 2 exposed
Issued
Oct 22, 2016
Abate by
Oct 28, 2016
Penalty
Initial $6,236 · Current $6,236
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: Note:  This requirement does not apply to float (ship) scaffolds where an edging of 3/4 inch x 1 1/2 inch (2 x 4 cm) wood or equivalent was used in lieu of toe boards.   a) Worksite - Employee was installing brick on a three story residential home while working from a fabricated frame scaffold.  The scaffold did not have toe boards installed; on or about 6/20/16.    Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (S) $6236
  • — C (S) $6236
  • — Z (S) $6236

1926.1053 B01

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 22, 2016
Abate by
Oct 28, 2016
Penalty
Initial $6,236 · Current $6,236
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:   a)    Worksite - Employee was installing brick on a three story residential home while working from a fabricated frame scaffold.  Employee was gaining access to the scaffold by using a 6ft A-Frame ladder that was extended approximately 1ft past the working level; on or about, 6/20/16.    Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (S) $6236
  • — C (S) $6236
  • — Z (S) $6236

1926.1053 B04

Serious Gravity 5 1 instance 1 exposed
Issued
Oct 22, 2016
Abate by
Oct 28, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.1053(b)(4): Ladder(s) were used for purposes other than the purpose for which they were designed:   a)    Worksite - Employee was installing brick on a three story residential home while working from a fabricated frame scaffold.  Employee was gaining access to the scaffold by using a Werner 6ft A-Frame ladder that was set up in the closed position; on or about, 6/20/16.    Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (S) $0
  • — C (S) $0
  • — Z (S) $0

1910.1200 E01

Other-than-serious 1 instance 3 exposed
Issued
Oct 22, 2016
Abate by
Dec 12, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(e)(1): The employer did not develop, implement, and/or maintain at the workplace a written hazard communication program which describes how the criteria specified in 29 CFR 1910.1200(f), (g), and (h) will be met (Construction Reference: 1926.59):  a) Worksite - Employees use materials such as, but not limited to, Portland Cement. A written hazard communication program was not in place; on or about, 6.20/16.    Note:  The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.  ABATEMENT NOTE:    The written Hazard Communication Program must include descriptions of how the following program elements, required by this regulation, will be developed, implemented, and conveyed to the employer's employee(s) who are exposed to hazardous materials:          a.   Labeling and other forms or warning:               Labels shall include at least the identity of the hazardous            chemical(s), the appropriate hazard warnings, the target organs,            and the name and address of the chemical manufacturer, importer or other responsible party;          b.   A list or inventory of all hazardous materials known to be present in the            workplace must be compiled and be maintained as part of the employer's            written Hazard Communication Program;          c.   Material Safety Data Sheets (MSDSs) for all materials used by            employee(s) in the workplace must be maintained and readily available            all employee(s) on all shifts.          d.   The employer's Hazardous Materials Information and Training Program            must be based upon the employer's written Hazard Communication            Program.  The training for employee(s) must include at least:  Methods and observation that may be used to detect the presence            or release of hazardous chemicals in the work area.                       The physical and health hazards of the chemicals in the work area.               The measures employee(s) can take to protect themselves, such as,            specific procedures, appropriate work practices, emergency            procedures, and personal protective equipment to be used.            The details of the employer's Hazard Communication Program            including an explanation of the labeling systems used, Material            Safety Data Sheets and how employees can obtain and use the            appropriate hazard information;          e.   Methods used to inform employees of the hazards associated with non            routine tasks must also be addressed in the employer's written program;            and          f.   The employer's written Hazard Communication Program must be            made available upon request.          For Multi Employer Work places, the employer's Written Hazard Communication       Program must also specifically address how:          a.   Material Safety Data Sheets for each hazardous material on the job            site will be provided to other employers in the event the other            employer's employee(s) may be exposed to these materials.          b.   The methods the employer will use to inform other employer(s) of            any precautionary measures that need to be taken to protect            employee(s) during normal operating conditions and in foreseeable            emergencies.          c.   The methods the employer will use to inform the other employer(s)            of the labeling system used in the workplace.
Recent events (3)
  • — R (O) $0
  • — C (O) $0
  • — Z (O) $0

1910.1200 G08

Other-than-serious 1 instance 3 exposed
Issued
Oct 22, 2016
Abate by
Dec 12, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(g)(8): The employer did not ensure that material safety data sheets were readily accessible to the employees in their work area during each work shift:  a) Worksite - Employees use materials such as, but not limited to, Portland Cement.  Material safety data sheets were not available on site; on or about, 6/20/16.     Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (O) $0
  • — C (O) $0
  • — Z (O) $0

1910.1200 H01

Other-than-serious 1 instance 3 exposed
Issued
Oct 22, 2016
Abate by
Dec 12, 2016
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:  a) Worksite - Employees use materials such as, but not limited to, Portland Cement. A training program was not in place; on or about, 6/20/16.   Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Recent events (3)
  • — R (O) $0
  • — C (O) $0
  • — Z (O) $0

View ABR Builders LLC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341566156.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.