OSHA Inspection: ESTES PLASTERING LLC

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of ESTES PLASTERING LLC in 600 GOLDEN RIDGE ROAD, GOLDEN, CO 80401 (NAICS 238140). OSHA activity number 341845014.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Estes Plastering LLC — free Get an email when a new federal OSHA severe-injury report for Estes Plastering LLC is published. One employer, no account, unsubscribe in one click.
Site address
600 GOLDEN RIDGE ROAD
City
GOLDEN
State
CO
ZIP
80401
Mailing
PO BOX 6660, TYLER, TX 75711
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238140
Employees
5
Ownership type
A

9 citations on file for this inspection.

1926.300 B04 II

Serious Gravity 5 1 instance 4 exposed
Issued
Nov 17, 2016
Penalty
Initial $2,138 · Current $2,138
29 CFR 1926.300(b)(4)(ii): The point of operation of machine(s) whose operation exposed an employee to injury was not guarded:  (a) On or about September 26, 2016, and at times prior, employees were exposed to laceration injuries while using a Kobalt table saw without a guard on the exposed blade.    Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $2138

1926.451 B01

Serious Gravity 10 1 instance 5 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $3,741 · Current $3,741
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):  a) On or about September 26, 2016 and at times prior, employees were exposed to fall hazards in excess of 12 feet while working on a scaffold.  The scaffold was not fully planked in that the working platform was less than 18 inches.   Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $3741

1926.451 B05 I

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(5)(i): The end of a platform 10 feet or less in length extended over its support more than 12 inches and the platform was not designed and installed so that the cantilevered portion of the platform is able to support employees and/or materials without tipping, or has guardrails which block employee access to the cantilevered end:  (a)  On or about September 26, 2016, and at times prior, employees were exposed to fall hazards where the scaffold planks extended over the support brace more than four feet.  Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1926.451 B07

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(b)(7): On scaffolds where platforms are overlapped to create a long platform, the overlap did not occur only over supports:  (a)  On or about September 26, 2016, employees were exposed to fall hazards in that the overlapping scaffold planks did not rest on supports.   Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1926.451 E01

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $3,741 · Current $3,741
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Cross-braces were used as a means of access:  (a) On or about September 26, 2016 and at times prior, employees were exposed to fall hazards in excess of 12 feet where no ladder or any other type of access/egress was provided.  Work platforms were accessed by climbing scaffold frames and/or bracing.    Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $3741

1926.451 F03

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  (a) On or about September 26, 2016 and at times prior, employees were exposed from falls of 12 feet and greater while working on the scaffold. The scaffold was found with planks that have cracks and some planks were missing. Guard rails and mid rails were missing on the scaffold. The scaffold and scaffold components were not inspected by a competent person prior to use. The scaffold had multiple defects to include pins which were not functional and affected the structural integrity.   Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1926.451 F07

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(f)(7): Scaffolds were not erected, moved, dismantled, or altered, by trained and experienced employees under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration:; Such activities were not performed only by experienced and trained employees selected for such work by the competent person.  (a) On or about September 26, 2016, and at times prior, employees were exposed to fall hazards in that the scaffold was not erected under the direction of a competent person.   Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1926.452 C02

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.452(c)(2): All brace connections were not secured:  (a)  On or about September 26, 2016, and at times prior, employees were exposed to fall hazards in that the scaffolding brace connections were not secured due to non-functional pins.  Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $0

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Nov 17, 2016
Abate by
Nov 23, 2016
Penalty
Initial $3,741 · Current $3,741
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  (a) On or about September 26, 2016 and at times prior, an employee was exposed to falls of 12 feet and greater while working on the scaffold. No guard rails or any other fall protection was in use.  Abatement Note:  Abatement certification and documentation are required for this item (see enclosed "Certification of Corrective Action Worksheet").
Recent events (1)
  • — Z (S) $3741

View Estes Plastering LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341845014.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.