PROVIDENCE, RI —
OSHA Inspection: CATHEDRAL ART METAL CO., INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of CATHEDRAL ART METAL CO., INC. in 25 MANTON AVENUE, PROVIDENCE, RI 02909 (NAICS 332999). OSHA activity number 341864015.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CATHEDRAL ART METAL CO., INC.
- Site address
- 25 MANTON AVENUE
- City
- PROVIDENCE
- State
- RI
- ZIP
- 02909
- Mailing
- 25 MANTON AVE. P.O. BOX 6146, PROVIDENCE, RI 02909
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- Employees
- 34
- Ownership type
- A
Citations
6 citations on file for this inspection.
1910.147 C04 II
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $4,848 · Current $3,900 Reduced
General-duty citation text
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): Establishment: On, or about, 10/26/2016 the employer did not develop machine specific procedures which clearly specify the techniques to control potentially hazardous energy during maintenance and servicing of machinery and equipment.
Recent events (2)
- — I (S) $3900
- — Z (S) $4848
1910.333 B02 II B
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.333(b)(2)(ii)(B): Control circuit devices, such as push buttons, selector switches, and interlocks, were used as the sole means for deenergizing circuits and equipment: Establishment: On, or about, 08/12/2016 the employer's energy control procedures did not specify that the electrically operated Power Presses were to be disconnected from all sources of electrical energy.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.147 C06 I
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Establishment: On, or about, 10/26/2016 the employer did not ensure that a periodic inspection of the energy control procedure was conducted at least annually.
Recent events (2)
- — I (S) $0
- — Z (S) $0
1910.212 A01
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $3,879 · Current $2,800 Reduced
General-duty citation text
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: Press Department: On, or about, 10/26/2016 the employer did not provide one or more methods of machine guarding in the following instances: (a) Power Press # 416: Employees were operating the power press whereby the rotating flywheel was not fully guarded. (b) Power Press # 817: Employees were operating the power press whereby the rotating flywheel was not fully guarded.
Recent events (2)
- — I (S) $2800
- — Z (S) $3879
1910.217 B08 III
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $3,879 · Current $2,800 Reduced
General-duty citation text
29 CFR 1910.217(b)(8)(iii): Mechanical power press control(s) did not incorporate a type of drive motor starter that would disconnect the drive motor from the power source in event of control voltage or power source failure and require operation of the motor start button to restart the motor when voltage conditions are restored to normal: Press Department: On, or about, 10/26/2016 the employer did not ensure that each mechanical power press had anti-repeat devices installed to prevent inadvertent restart after power is restored following a power failure.
Recent events (2)
- — I (S) $2800
- — Z (S) $3879
1910.217 E01 I A
- Issued
- Feb 27, 2017
- Abate by
- May 24, 2017
- Penalty
- Initial $3,879 · Current $0 Reduced
General-duty citation text
29 CFR 1910.217(e)(1)(i)(A): Periodic and regular inspections of each power press were not conducted to ensure that all of its parts, auxiliary equipment, and safeguards, including clutch/brake mechanism, anti-repeat feature, and single-stroke mechanism, are in safe operating condition and adjustment: Press Department: On, or about, 10/26/2016 the employer did not ensure that periodic and regular inspections of each power press was conducted to ensure safe operating condition and adjustment.
Recent events (2)
- — I (O) $0
- — Z (S) $3879
More inspections at Cathedral ART Metal CO., INC.
View Cathedral ART Metal CO., INC.'s full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in RI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341864015.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.