HELENA, AL —
OSHA Inspection: L.E. BELL CONSTRUCTION COMPANY, INC.
Federal Agency inspection · Safety discipline
At a glance
On , OSHA opened a federal Agency safety inspection of L.E. BELL CONSTRUCTION COMPANY, INC. in 1305 RIVER ROAD, HELENA, AL 35080 (NAICS 237120). OSHA activity number 341882900.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- L.E. BELL CONSTRUCTION COMPANY, INC.
- Site address
- 1305 RIVER ROAD
- City
- HELENA
- State
- AL
- ZIP
- 35080
- Mailing
- 1226 COUNTY ROAD 11, HEFLIN, AL 36264
What kind of inspection was it?
- Inspection type
- Federal Agency (M)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 237120
- Employees
- 485
- Ownership type
- A
Citations
2 citations on file for this inspection.
1926.65 Q01
- Issued
- Mar 14, 2017
- Abate by
- Mar 24, 2017
- Penalty
- Initial $12,675 · Current $12,675
General-duty citation text
29 CFR 1926.65(q)(1): The employer, who would evacuate employees from the danger area when an emergency occurred and would not permit any employees to assist in handling the emergency, did not provide an emergency action plan in accordance with 1926.35: (a) On or about 10/31/2016 - at 1305 River Rd, Helena, AL, the employer did not provide an emergency action plan in accordance with requirements of 29 CFR 1926.65(q)(2) or 29 CFR 1926.35 to address emergency escape procedures and emergency escape route assignments, such as but not limited to, immediately turning off all ignition sources and having a designated meeting location in the event of a gasoline release.
Recent events (2)
- — I (O) $12675
- — Z (S) $12675
1926.651 B03
- Issued
- Mar 14, 2017
- Abate by
- Mar 24, 2017
- Penalty
- Initial $12,675 · Current $12,675
General-duty citation text
29 CFR 1926.651(b)(3): When excavation operations approached the estimated location of underground installations, the exact location of the installations was not determined by safe and acceptable means: (a) On or about 10/31/2016 - at 1305 River Rd, Helena, AL, when excavating Colonial Pipeline Company's Line 1 containing A4 gasoline, the exact location of the pipeline was not determined by safe and acceptable means, such as but not limited to, Colonial Pipeline Company's Excavation and Backfill Procedure MP-01-001 Rev 5 that requires the pipeline to be clearly marked in the planned excavation area using both a line locator and a probe rod; confirming the pipeline depth and horizontal location in at least two places in the planned excavation work area using two of the following methods: line locator, hand excavation, probe rod, or soft dig technology; and ensuring mechanical excavation is done parallel to pipeline.
Recent events (2)
- — I (S) $12675
- — Z (S) $12675
More inspections at L.E. Bell Construction Company, INC.
View L.E. Bell Construction Company, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 237120)
More inspections in AL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341882900.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.