Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: MRC POLYMERS, INC.

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of MRC POLYMERS, INC. in 3307 S. LAWNDALE AVE., CHICAGO, IL 60623 (NAICS 325211). OSHA activity number 341897064.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch MRC Polymers, INC. — free Get an email when a new federal OSHA severe-injury report for MRC Polymers, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
MRC POLYMERS, INC.
Site address
3307 S. LAWNDALE AVE.
City
CHICAGO
State
IL
ZIP
60623
Mailing
3307 S. LAWNDALE AVE., CHICAGO, IL 60623
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325211
Employees
46
Ownership type
A

3 citations on file for this inspection.

1910.147 C06 I

Serious Gravity 5 1 instance 40 exposed
Issued
Apr 7, 2017
Penalty
Initial $6,338 · Current $3,169 Reduced
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed.  Production area - On or about November 8, 2016, in the facility, authorized employees were required to perform maintenance and/or service on various machinery including the aspirator, mixer and wash line palletizer. The employer did not conduct periodic inspection of the energy control procedures at least annually to ensure that the procedures requirements of the standard were being followed.
Recent events (2)
  • — I (S) $3169
  • — Z (S) $6338

1910.147 C04 II

Other-than-serious 1 instance 4 exposed
Issued
Apr 7, 2017
Abate by
May 3, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.147(c)(4)(ii): The procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following:  On or about November 8, 2016, the company's written lockout procedures did not provide a means to enforce compliance for authorized employees performing maintenance and/or service on the Aspirator, Mixer and other operating equipment.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

1910.147 F02 I

Other-than-serious 1 instance 3 exposed
Issued
Apr 7, 2017
Abate by
May 3, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.147(f)(2)(i): Whenever outside servicing personnel are to be engaged in activities covered by the scope and application of this standard, the on-site employer and the outside employer shall inform each other of their respective lockout or tagout procedures.  Entire facility - On or about November 8, 2016, the company's written lockout procedures did not include a provision for the on- site employer and an outside employer (contractor) to inform each nother of their respective lockout or tagout procedures.
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View MRC Polymers, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341897064.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.