OSHA Inspection: ORO CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ORO CONSTRUCTION, INC. in 22964 PRAIRIE LANE, PRAIRIE VIEW, IL 60069 (NAICS 238130). OSHA activity number 341945913.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch ORO Construction, INC. — free Get an email when a new federal OSHA severe-injury report for ORO Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
22964 PRAIRIE LANE
City
PRAIRIE VIEW
State
IL
ZIP
60069
Mailing
106 ASCOT LANE, STREAMWOOD, IL 60107
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
Employees
2
Ownership type
A

6 citations on file for this inspection.

1926.451 B01

Serious Gravity 5 2 instances 2 exposed
Issued
Dec 9, 2016
Abate by
Dec 15, 2016
Penalty
Initial $3,207 · Current $1,700 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):          a) On or about November 30, 2016, employees were exposed to the hazard of falling approximately 16 feet while working from scaffolding platforms that were not fully planked.        In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1700
  • — Z (S) $3207

1926.451 G01

Serious Gravity 5 2 instances 2 exposed
Issued
Dec 9, 2016
Abate by
Dec 15, 2016
Penalty
Initial $0 · Current $0
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level:        a) On or about November 30, 2016, employees were exposed to the hazard of falling from an elevation of approximately 16 feet while working from scaffolding without the benefit of fall protection.     In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.501 B13

Serious Gravity 10 3 instances 2 exposed
Issued
Dec 9, 2016
Abate by
Dec 15, 2016
Penalty
Initial $3,741 · Current $1,983 Reduced
29 CFR 1926.501(b)(13): Each employee(s) engaged in residential construction activities 6 feet (1.8 m) or more above lower levels were not protected by guardrail systems, safety net system, or personal fall arrest system, nor were employee(s) provided with an alternative fall protection measure under another provision of paragraph 1926.501(b):                 a) Front elevation of building - On or about November 30, 2016, employees were exposed to the hazard of falling approximately 23 feet from the upper elevations of the building while performing carpentry work.     b) Front elevation of building - On or about November 30, 2016, employees were exposed to the hazard of falling approximately 30 feet from the upper elevations of the building while performing carpentry work.     c) Second story of building - On or about November 30, 2016, employees were exposed to the hazard of falling approximately 10 feet from an unprotected deck while performing carpentry work.          In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification.  This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.
Recent events (2)
  • — I (S) $1983
  • — Z (S) $3741

1910.178 L01 I

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 9, 2016
Abate by
Jan 30, 2017
Penalty
Initial $2,672 · Current $1,415 Reduced
29 CFR 1910.178(l)(1)(i): The employer did not ensure that each powered industrial truck operator was competent to operate a powered industrial truck safely, as demonstrated by the successful completion of the training and evaluation specified in this paragraph (l):     29 CFR 1926.602(d): Note: The requirements applicable to construction work under paragraph (d) of this section are identical to those set forth at paragraph (l) of 29 CFR 1910.178.     a) On or about November 30, 2016, the employer engaged in the operation of an all-terrain forklift without ensuring competency to operate the equipment safely, as demonstrated by successful completion of forklift training and evaluation.          In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (S) $1415
  • — Z (S) $2672

1926.1053 B01

Serious Gravity 5 1 instance 2 exposed
Issued
Dec 9, 2016
Penalty
Initial $2,138 · Current $1,102 Reduced
29 CFR 1926.1053(b)(1): Portable ladders were used for access to an upper landing surface and the ladder side rails did not extend at least 3 feet (.9 m) above the upper landing surface to which the ladder was used to gain access:         a) On or about November 30, 2016, employees were exposed to the hazard of falling approximately 10 feet where a portable extension ladder did not extend above the landing surface of a second story deck.         No abatement certification or documentation required for this violation.
Recent events (2)
  • — I (S) $1102
  • — Z (S) $2138

1926.503 B01

Other-than-serious 2 instances 2 exposed
Issued
Dec 9, 2016
Abate by
Jan 30, 2017
Penalty
Initial $0 · Current $0
29 CFR 1926.503(b)(1): The employer did not verify fall protection training by preparing a written certification record:         a) On or about November 30, 2016, the employer did not prepare written certification records related to employee fall protection training.       In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
  • — I (O) $0
  • — Z (O) $0

View ORO Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 341945913.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.