OSHA Inspection: G & H GENERAL CONSTRUCTION, LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of G & H GENERAL CONSTRUCTION, LLC in 201 W. GLENN AVE., AUBURN, AL 36830 (NAICS 238320). OSHA activity number 342412780.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch G & H General Construction, LLC — free Get an email when a new federal OSHA severe-injury report for G & H General Construction, LLC is published. One employer, no account, unsubscribe in one click.
Site address
201 W. GLENN AVE.
City
AUBURN
State
AL
ZIP
36830
Mailing
2018 SANTENAY DR. SW, MARIETTA, GA 30008
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238320
Employees
4
Ownership type
A

7 citations on file for this inspection.

1910.1200 E01

Serious Gravity 1 1 instance 4 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $1,630 · Current $1,000 Reduced
29 CFR 1910.1200(e)(1): Employer had not developed or implemented a written hazard communication program included the requirements outlined in 29 CFR 1910.1200(e)(1)(i) and (e)(1)(ii):   a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer exposed employees to hazardous chemicals and substances such as but not limited to Portland Cement, cement board mesh, polystyrene and polyblend sound grout without maintaining a written hazard communication program as required by the standard.
Recent events (2)
  • — I (S) $1000
  • — Z (S) $1630

1910.1200 H01

Serious Gravity 1 1 instance 4 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(1): Employees were not provided effective information and training on hazardous chemicals in their work area at the time of their initial assignment and whenever a new hazard that the employees had not been previously trained about was introduced into their work area:  a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer exposed employees to hazardous chemicals and substances such as but not limited to Portland Cement, cement board mesh, polystyrene and polyblend sound grout without providing information and training on these chemicals and substances as required by the standard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1910.1200 H03 IV

Serious Gravity 1 1 instance 4 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $0 · Current $0
29 CFR 1910.1200(h)(3)(iv): Employee training did not include the details of the hazard communication program developed by the employer, including an explanation of the labeling system and the material safety data sheet, and how employees can obtain and use the appropriate hazard information: (Construction Reference: 1926.59)  a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer exposed employees to hazardous chemicals and substances such as but not limited to Portland Cement, cement board mesh, polystyrene and polyblend sound grout without providing information and training on the Global Harmonization System as required by the standard.
Recent events (2)
  • — I (S) $0
  • — Z (S) $0

1926.451 B03 II

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $3,803 · Current $2,500 Reduced
29 CFR 1926.451(b)(3)(ii): The maximum distance from the face for plastering and lathing operations shall be 18 inches (46 cm):  a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer allowed his employees to work from a mast climber scaffold which was up to 29 1/2 inches from the wall they were working on exposing the employee to a fall hazard of up to 28 feet to the ground below.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $3803

1926.451 F03

Serious Gravity 10 2 instances 4 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $3,803 · Current $2,500 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:  a)  At 201 W. Glenn Ave., (Edge of Building) Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer exposed employees to fall hazards in that employees were allowed to work from a mast climber scaffold which had not been inspected by a competent person for visible defects before each shift.  b)  At 201 W. Glenn Ave., (Middle of Building) Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer exposed employees to fall hazards in that employees were allowed to work from a mast climber scaffold which had not been inspected by a competent person for visible defects before each shift.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $3803

1926.451 G01

Serious Gravity 10 1 instance 1 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $3,803 · Current $2,500 Reduced
29 CFR 1926.451(g)(1): Employees on scaffolds more than 10 feet (3.1 m) above a lower level were not protected from falling to that lower level by fall protection established in paragraphs (g)(1)(i)-(vii) of this section:  a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer allowed his employees to operate and work from a mast climber scaffold without fall protection exposing the employee to a fall hazard of up to 28 feet to the ground below.
Recent events (2)
  • — I (S) $2500
  • — Z (S) $3803

1926.454 A

Serious Gravity 10 1 instance 4 exposed
Issued
Aug 29, 2017
Abate by
Sep 25, 2017
Penalty
Initial $3,803 · Current $1,500 Reduced
29 CFR 1926.454(a): The employer did not have each employee who performed work while on a scaffold trained by a person qualified in the subject matter to recognize the hazards associated with the type of scaffold being used and to understand the procedures to control or minimize those hazards:  a)  At 201 W. Glenn Ave., Auburn, Alabama:  On or about June 15, 2017 and at times prior; the employer allowed his employees to work from a mast climber scaffold without ensuring that each employee had been trained on the hazards associated with this scaffolding exposing his employees to a fall hazard of up to 28 feet to the ground below.
Recent events (2)
  • — I (S) $1500
  • — Z (S) $3803

View G & H General Construction, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342412780.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.