Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,549Inspections Most recent open 2026-08-27 Last loaded 2026-08-31

OSHA Inspection: RAPID DEPLOYABLE SYSTEMS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of RAPID DEPLOYABLE SYSTEMS, INC. in USS GONZALEZ DDG 66 200 LIGON ST, NORFOLK, VA 23523 (NAICS 336611). OSHA activity number 342447117.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rapid Deployable Systems, INC. for free Get an email when a new federal OSHA severe-injury report for Rapid Deployable Systems, INC. is published. One employer, no account, unsubscribe in one click.
Site address
USS GONZALEZ DDG 66 200 LIGON ST
City
NORFOLK
State
VA
ZIP
23523
Mailing
1005 BANKTON CIRCLE, HANAHAN, SC 29410
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (B)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336611
Employees
22
Ownership type
Private (A)

2 citations on file for this inspection.

1910.303 G02 I

Serious Gravity 1 1 instance 2 exposed
Issued
Aug 31, 2017
Abate by
Sep 27, 2017
Penalty
Initial $1,847 · Current $1,385 Reduced
29 CFR 1910.303(g)(2)(i): Live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by approved cabinets or other forms of approved enclosures, or other means listed under this provision:  a)    USS Gonzalez DD-66, Helicopter Deck: On or about 06/27/2017, the temporary branch circuit of quadraplex receptacle outlets had one duplex side missing a cover screw that caused the outlet to lift from the box thereby exposing employees to internal conductors.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1385.25
  • · Z (S) $1847

1910.304 G05

Serious Gravity 1 1 instance 2 exposed
Issued
Aug 31, 2017
Abate by
Sep 27, 2017
Penalty
Initial $1,847 · Current $1,385 Reduced
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective:  a)    USS Gonzalez DD-66, Helicopter Deck: On or about 06/27/2017, the exhaust fan power supply cord was missing its ground prong from the male attachment plug.   Abatement certification required within 10 days after abatement date.  The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Recent events (2)
  • · I (S) $1385.25
  • · Z (S) $1847

View Rapid Deployable Systems, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 342447117.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.