VIRGINIA BEACH, VA —
OSHA Inspection: SNOW JR. & KING, INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of SNOW JR. & KING, INC. in NAS OCEANA DAM NECK ANNEX 352 BULLPUP ST. BLDG B469, VIRGINIA BEACH, VA 23461 (NAICS 238140). OSHA activity number 342449188.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SNOW JR. & KING, INC.
- Site address
- NAS OCEANA DAM NECK ANNEX 352 BULLPUP ST. BLDG B469
- City
- VIRGINIA BEACH
- State
- VA
- ZIP
- 23461
- Mailing
- 2415 CHURCH ST, NORFOLK, VA 23504
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- A
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- Employees
- 140
- Ownership type
- A
Citations
6 citations on file for this inspection.
1926.451 B01 I
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $0 · Current $0
General-duty citation text
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to scaffolding planks at heights greater than 10 feet high with gaps in excess of 1 inch. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (O) $0
- — Z (O) $0
1926.451 E09 IV
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $11,408 · Current $6,844 Reduced
General-duty citation text
29 CFR 1926.451(e)(9)(iv): The use of cross braces on tubular welded frame scaffolds was not prohibited as a means of access or egress. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were only able to climb on and through the cross braces on the tubular welded frame scaffold system in order to access and egress the extended work platform where they were standing while pumping grout in the block walls. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $6844
- — Z (S) $11408
1926.451 F13
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $11,408 · Current $6,844 Reduced
General-duty citation text
29 CFR 1926.451(f)(13): Debris was allowed to accumulate on scaffold platforms: (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to excess debris that accumulated on and about the walking and working surfaces of the scaffolding platforms. Building materials, medium and small sized loose concrete debris/rocks/gravel, loose lumbar, and excess scaffolding parts was found about the entire platform. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $6844
- — Z (S) $11408
1926.451 G04 I
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $11,408 · Current $6,844 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms before being released for use by employees other than erection/dismantling crews: (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461: Instance #1: Employee(s) were exposed to open sides where guardrail systems were not installed along the 90 degree turns around the corners of the structure. Approximate height to ground below was 15 feet. Instance #2: Employee(s) were exposed to an inadequate guarded side of the extended work platform where there was not an adequate guard rail system nor was personal fall protection used. A platform extended side-bracket was placed at the end to act as a guardrail system. Approximate height to ground below was 19 feet. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $6844
- — Z (S) $11408
1926.451 G04 IV
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $11,408 · Current $6,844 Reduced
General-duty citation text
29 CFR 1926.451(g)(4)(iv): Midrails were not installed at a height approximately midway between the top edge and of the guardrail system and the platform surface. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to scaffolding that was missing a midrail approximately midway between the top edge of the guardrail system and the platform surface. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $6844
- — Z (S) $11408
1926.451 H02 II
- Issued
- Dec 7, 2017
- Abate by
- Jan 4, 2018
- Penalty
- Initial $4,889 · Current $2,933 Reduced
General-duty citation text
29 CFR 1926.451(h)(2)(ii): A toeboard was not erected along the edge of platforms more than 10 feet (3.1 m) above lower levels for a distance sufficient to protect employees below: (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to struck-by hazards from a welded tubular steel scaffolding system that did not contain toe-boards at the inward areas where employees pass underneath. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.
Recent events (2)
- — I (S) $2933
- — Z (S) $4889
More inspections at Snow JR. & King, INC.
View Snow JR. & King, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238140)
More inspections in VA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342449188.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.