OSHA Inspection: GESTIDO CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of GESTIDO CONSTRUCTION LLC in 16479 BOTANIKO NORTH, WESTON, FL 33326 (NAICS 236115). OSHA activity number 342474954.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Gestido Construction LLC — free Get an email when a new federal OSHA severe-injury report for Gestido Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
16479 BOTANIKO NORTH
City
WESTON
State
FL
ZIP
33326
Mailing
6073 NW 167 STREET UNIT C-1, HIALEAH, FL 33015
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
B
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236115
Employees
2
Ownership type
A

5 citations on file for this inspection.

1926.451 B01

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,803 · Current $3,042 Reduced
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii):       On or about 07/14/2017, at the above addressed worksite, employees working from a scaffold that was not fully planked were exposed to a fall hazard.
Recent events (2)
  • — I (S) $3042.4
  • — Z (S) $3803

1926.451 C02

Serious Gravity 10 1 instance 5 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,803 · Current $3,042 Reduced
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:    29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.    29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, and uprights shall bear on base plates and mud sills or other adequate firm foundation.    29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames,  or uprights did not bear on base plates, mud sills or other adequate firm foundation:    On or about 07/14/2017, at the above addressed worksite, employees were working from a fabricated frame scaffold that was not on mudsills exposing them to a fall hazard.
Recent events (2)
  • — I (S) $3042.4
  • — Z (S) $3803

1926.451 E01

Serious Gravity 10 1 instance 2 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,803 · Current $3,042 Reduced
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used.  Crossbraces were used as a means of access:    On or about 07/14/2017, at the above addressed worksite, a ladder was not provided and employees were climbing the crossbars on a fabricated frame scaffold exposing them to a fall hazard.
Recent events (2)
  • — I (S) $3042.4
  • — Z (S) $3803

1926.451 G01

Serious Gravity 10 1 instance 4 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,803 · Current $3,042 Reduced
29 CFR 1926.451(g)(1): Each employee on a scaffold more than 10 feet above a lower level were not protected from falling to that lower level.    On or about 07/14/2017, at the above addressed worksite, employees working on the top deck of a two tier scaffold did not have any fall protection exposing them to a fall hazard.
Recent events (2)
  • — I (S) $3042.4
  • — Z (S) $3803

1926.451 F03

Serious Gravity 10 1 instance 6 exposed
Issued
Dec 7, 2017
Penalty
Initial $3,803 · Current $3,042 Reduced
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity:    On or about 07/14/2017, at the above addressed worksite, employees were exposed to a struck-by hazard from a pully hoist that was not decurely mounted on the top frame of the scaffold.
Recent events (2)
  • — I (S) $3042.4
  • — Z (S) $3803

View Gestido Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342474954.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.