WILBRAHAM, MA —
OSHA Inspection: D.P. CARNEY CONSTRUCTION INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of D.P. CARNEY CONSTRUCTION INC. in 45 POST OFFICE PARK, WILBRAHAM, MA 01095 (NAICS 238160). OSHA activity number 342711462.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- D.P. CARNEY CONSTRUCTION INC.
- Site address
- 45 POST OFFICE PARK
- City
- WILBRAHAM
- State
- MA
- ZIP
- 01095
- Mailing
- 34 HORSESHOE CIRCLE, WARE, MA 01082
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- B
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238160
- Employees
- 20
- Ownership type
- A
Citations
1 citation on file for this inspection.
1926.501 B10
- Issued
- Jan 3, 2018
- Penalty
- Initial $5,070 · Current $2,535 Reduced
General-duty citation text
29 CFR 1926.501(b)(10): Each employee engaged in roofing activities on low-slope roofs, with unprotected sides and edges 6 feet (1.8 m) or more above lower levels was not protected from falling by guardrail systems, safety net systems, personal fall arrest systems, or a combination of warning line system and guardrail system, warning line system and safety net system, or warning line system and personal fall arrest system, or warning line system and safety monitoring system: a) 45 Post Office Park., Wilbraham, MA: On or about October 18, 2017, 2 employees were roofing the roof of this building without any fall protection, more than 11 feet above the next lower level. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1).
Recent events (2)
- — I (S) $2535
- — Z (S) $5070
More inspections at D.P. Carney Construction INC.
View D.P. Carney Construction INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238160)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 342711462.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.